< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=850590718886936&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

PVC Pipe & Cone

SHARE:
  • AluLITE Formwork

    AluLITE Formwork

    TECON Aluminium Formwork AluLITE is a new material system formwork made from aluminum allo...
  • Dam Formwork DB180/240

    Dam Formwork DB180/240

    TECON Dam formwork DB180/240 is with high dependability and loading capacity for mass conc...
  • Slab Table Formwork

    Slab Table Formwork

    TECON Slab table formwork is one of the most efficient slab shuttering solution, especiall...
Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!