< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

FAQ

  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

  • Q
    What is the package method?

    We have standard steel pallet, wooden pallet etc. which suits to container transportation.

  • Q
    Do you have any guarantee on the quality?

    We have guarantees on the quality on a different product basis.

  • Q
    Do you offer buy back system or rental business?

    We offer a buyback system on medium and enormous scale projects, but we do not have any rental business yet.

  • Q
    Do you have on-site supervision service?

    Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.

  • Q
    Are you factory or trading company?

    We are a formwork & scaffolding engineering company that works with more than 20 leading factories on specialized components based on TECON design, mould, fabrication, and QC standards. Among them, we hold shares with two factories for in-depth cooperation.

  • Q
    What benefit we can get from TECON?

    From TECON, you can get the full range of advanced systems with excellent quality, know-how, and in-time service. They will lead to increased productivity, labour saving and high cost down on your site as a result.

  • Q
    Are you looking for agent or distributor in our country?

    Yes, we are looking for an agent or distributor worldwide based on a win-win relationship. If you have such experience, the capability of investment, as well as business plan & goal, we'd be glad to discuss with you in detail. TECON has its special agent and distributor policy waiting to support your formwork & scaffolding industry success.

  • Q
    How to purchase your formwork and scaffolding?

    For any order you proceed with, TECON will follow the below steps.


    Step 01. Confirm the order based on our proposal after technical & commercial communication – by Customer, TECON Overseas Sales team and Technical team.


    Step 02. Make the deposit – by Customer.


    Step 03. Report on production schedule weekly until completion – by TECON Customer Care team.


    Step 04. Execute pre-shipment inspection – by Customer or Third Party Inspection company.


    Step 05. Effect the balance payment – by Customer.


    Step 06. Arrange the loading and shipment after balance payment – by the TECON Customer Care team.


    Step 07. Submit the complete set of shipping documents via courier after departure – by the TECON Customer Care team.


    Step 08. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings – by the TECON Overseas Sales team.


    Step 09. Site supervision – By TECON Site Supervision team.