Large slab area rotation
Drop-head panels strip early while props stay in place, so the next bay can start.
SOLUTION 02 Slab & Beam
Fast, flexible horizontal formwork for slabs, beams, and large-span structures. TECON offers Alu-Flex, Slab Flex 20, H20 girder, and slab table systems for efficient concrete slab construction.
TECON slab and beam formwork covers the full range of horizontal concrete construction. Drop-head technology enables early panel stripping at 3–7 days while props remain supporting the slab.
Aluminium Alu-Flex panels are 65% lighter than steel, so one person can handle them. Slab Flex 20 timber beams adapt to any column grid layout.
Recommended slab and beam formwork by project type.
| Application | Dimensions | Recommended System | Key Advantage |
|---|---|---|---|
| Open slab areas | 20–100 m² | Alu-Flex + drop head | Fast rotation, schedule-driven |
| Varying beam spans | 2.0–8.0 m | Slab Flex 20 | Adapts to any grid |
| Heavy industrial slabs | 12 kN/m² | H20 + props | High load capacity |
| Large repetitive bays | Up to 80 m² | Slab table | Crane-handled, fastest cycle |
Common slab and beam conditions solved by TECON systems.
Drop-head panels strip early while props stay in place, so the next bay can start.
Slab Flex 20 covers irregular spans across the floor plate without a custom beam every time.
Panels come off at 3–7 days. Props remain until the slab can carry itself.
Alu-Flex at 15 kg/m² can be set by one person. No crane is required for standard panels.
Product lines for slab and beam applications.

ALUMINIUM
Aluminium drop-head panels. 15 kg/m². Early striking without removing props.
View Product
TIMBER BEAM
Timber beam slab formwork. Most flexible for irregular layouts and varying spans.
View Product
GIRDER
Timber H20 beams for beam and slab formwork. Cut and combined to any span.
View Product
TABLE
Crane-handled table system for large repetitive bays. Fast rotation.
View ProductWhy TECON horizontal systems shorten the floor cycle.
Strip panels at 3–7 days while props remain. Shorter floor cycle.
Panel weight 65% lighter than steel. One-person handling.
Spans from 2.0 m to 8.0 m without custom parts.
Four days per floor on multi-storey programmes.
TECON slab and beam systems in action.
Tell us your slab dimensions, beam spans, and project schedule. Our team will recommend the system.