TECON Cimbing Formwork CB180 / CB240

TECON Climbing Formwork CB 180 and CB 240 is a crane-assisted jumping formwork system for vertical core walls and shear walls. Using heavy-duty triangular brackets anchored to cured concrete, the system supports high construction loads during double-sided wall forming. It relies entirely on crane lifting for quick, unit-by-unit repositioning in high-rise projects.

Features & Benefits

Climbing Formwork Features and Benefits

Single-Lift Climbing Efficiency: The complete unit can be repositioned to the next pouring level with a single crane lift, significantly reducing handling time and improving overall productivity.
Zero Lateral Frame Load: Concrete pressure during pouring is entirely absorbed by through-wall tie rods, ensuring the frame carries no lateral concrete load.
Standard 3-Tier Platforms: Features exactly three dedicated levels, including a top platform for pouring, a main platform for formwork, and a suspended platform for anchor recovery.
Secure Anchor Bearing: The heavy-duty bracket anchors into concrete and braces against the lower wall, safely transferring upper construction loads to the building.
System Compatibility: Fully compatible with TECON wall formwork systems, including: TECON Base 20 Wall Formwork, other TECON wall solutions

Climbing Formwork Application

Suitable for high-rise core walls, bridge piers, LNG storage tanks, and power plant structures requiring efficient and safe vertical construction.

Technical Specifications

Climbing Formwork Technical Specifications

System Type Climbing Wall Formwork
Material H20 timber beam (aluminum beam), climbing bracket and anchoring system
Standard Bracket Height 11 m
Working Platform Number 3 floors
Permissible Live Load Main platform: 3 kN/m2
Top platform: 0.75kN/m2 ; 1.5 kN/m2 (for truss type)
Suspended platform: 0.75 kn/m2
Standard Unit Size 4 m (with 2 pieces of bracket)
Platform Width 1.8/2.4 m
Max One-time Casting Height 4.5/6 m (for truss type)
Formwork Shifting Distance 75 cm (with H20 Timber Beam Formwork System)
Permissible Climbing Pitch Angle
Installation Time 4-6 units/day (a group of 6 people, without formwork panel)
Formlining 18/21 mm birch plywood, hardwood, and polar plywood;
Hollow Plastic Board;
TECON Plas-tech
Connection Technology Single-part anchoring
Anchorage Pull-out Capacity 50 kN
Assembly Method Ground pre-assembly
Handling Method Tower Crane

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *