TECON Protection Screen

TECON Protection Screen is a modular, high-rise façade protection system tailored for both new construction and building renovation. Driven by an integrated hydraulic climbing system, it operates entirely crane-free. With flexible, customizable working platforms, it provides a fully sealed, weather-protected environment that maximizes site safety.

Features & Benefits

Protection Screen Features and Benefits

  • Crane-Independent Climbing: Uses a dedicated hydraulic cylinder to lift the system autonomously, significantly reducing tower crane occupancy and improving site logistics.
  • Dual Anti-Drop Safety: Engineered with an advanced dual anti-drop mechanism and full-enclosure screening to ensure ultimate safety for personnel operating at height.
  • Customizable Flexible Platforms: Offers 1 to 3 layers of configurable working platforms to perfectly balance project requirements and budget optimization.
  • Secure Structure Anchoring: Attaches directly to the concrete structure via heavy-duty through-slab or through-wall anchoring, guaranteeing robust stability during climbing.
  • Versatile Construction Tool: Ideal as both a reliable safety barrier and a heavy-duty operation platform, supporting both new façade installations and structural renovations.

Protection Screen Application

Suitable for comprehensive façade protection, perimeter edge safety, and exterior finishing platforms in mid-to-high-rise residential and commercial projects.

Technical Specifications

Protection Screen Technical Specifications

System Type Facade protection system
Material Climbing bracket, anchoring system, and mobile hydraulic station
Standard Bracket Height 12.5 m
Covered Floor Number Min 2.5 floors
Working Platform Levels 1-3 floors or customized
Platform Clearance 0.34 m (Clear gap between screen and slab edge)
Standard Unit Size 7 m
Platform Width 1 m
Platform Weight 3.0 t (with platform) / 2.4 t (without decking)
Permissible Live Load 1.5 kN/m2
Installation Time 2 units/day (a group of 6 people)
Connection Technology Cantilever beam / anchoring components
Climbing Speed 30 min/floor/unit (Total duration including system resetting)
Assembly Method Ground level pre-assembly
Handling Method Hydraulic cylinder

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *