TECON supported a 14-story, 600 ㎡ apartment project in Honduras with Adjustable HETO Frame formwork for columns and Plastic Formwork TP60 for floors and beams. The technical team provided a complete solution and detailed assembly guidance. Products were delivered on time and passed quality inspection, with TECON providing ongoing on-site support to ensure efficient, safe construction.