TECON Shoring Tower TST60

The fastest frame shoring system for great heights and heavy loads

TECON Shoring Tower TST60 is a universal modular scaffolding system designed for diverse shoring needs. Its lightweight yet strong construction provides a cost-effective solution for formwork support, while the modular design enables quick assembly and flexible adjustment, making it ideal for high shoring and heavy-load applications.

Features & Benefits

Shoring Tower TST60 Features and Benefits

  • Simple & Efficient Assembly – Few component types allow quick assembly, and the tower can be moved as a whole, saving time and improving site efficiency.
  • Easy Transportation – Lightweight, frame-type design enables one-time relocation up to 15 m, reducing labor and speeding up construction cycles.
  • High Load Capacity – Each leg supports up to 60 kN with a 2.5 safety factor (fully complied with EU Standard), ensuring dependable performance for slabs, beams, and heavy-load applications.
  • Adaptable – Shoring height and width can be quickly and continuously adjusted to suit different spans, heights, and site conditions.
  • Versatility – Adapts to various slab and beam loads, avoids repeated assembly, and fits multiple project types, from bridges to factories and subways.

Shoring Tower TST60 Application

Bridge construction; subway projects; hydro power stations; factories; logistics centers; commercial buildings; industrial engineering projects

Technical Specifications

Base 20 Wall Formwork Technical Specifications

System Type Shoring System
Material Q355 Steel Profile
Diameter 60×3 mm
Standard Frame Size 1.5×1.5/1.2/1.0 m;

1.2×1.2/1.0 m

Max Support height 30 m
Load Capacity 60 kN/leg (up to 13 m)
Installation Time 180 m3/person/day
Handling Method Trolley/Tower Crane
Load Quantity Around 13 t per 40 HQ container

Shoring Tower TST60 3D Assembly Tutorial

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *