TECON Self-Climbing Platform SCP is a fully enclosed motorized scaffolding system designed for high-rise structures equal to or exceeding 80m. Attached directly to the building, the integrated system utilizes synchronized electric hoists to climb or descend floor by floor autonomously. Featuring multi-layered working platforms and automated safety devices, it provides secure, weather-protected edge protection for both structural concreting and exterior façade finishing.

Features & Benefits

Self-climbing Platform SCP Features and Benefits

  • Efficient Crane-Free Climbing: Operates entirely via synchronized electric hoists to eliminate tower crane dependency and accelerate construction cycles.
  • Stationary Electric Hoists: Features a fixed configuration that eliminates the need to manually move heavy hoists between climbs, saving labor and operational time.
  • Intelligent Safety Control: Integrated sensors continuously monitor lifting loads, triggering immediate localized alarms and automated braking if anomalies occur.
  • High Component Reusability: Composed of versatile modular lengths delivering an 80 to 90 percent turnover rate across different project layouts.
  • Flexible Assembly Solutions: Supports efficient ground pre-assembly or direct-on-structure installation when onsite space is highly constrained.

Self-climbing Platform SCP Application

Specially optimized for regular structural layouts in high-rise and super high-rise projects equal to or exceeding 80 m in height.

Technical Specifications

Self-climbing Platform SCP Technical Specifications

System Type Facade protection screen
Material Climbing bracket, anchoring system, electric hoist, electronic control system
Standard Bracket Height 14/16/18 m
Covered Floor Number 4.5 floor
Working Platform Tiers 5 floors
Standard Unit Size 5 m (platform standard affects width)
Platform Width 0.6 m (without side panels)
Platform Weight Approx. 36 kg/m2 (without components)
Installation Time 2 units/day (a group of 6 people)
Permissible Live Load 2.0 kN/㎡ for 3-tier simultaneous operation
3.0 kN/㎡ for 2-tier simultaneous operation
Connection Technology Cantilever beam / high-strength tie rods
Climbing Speed 45 min/floor/area (Total duration including preparation and average resetting times)
Assembly Method Ground level pre-assembly or direct on-structure installation
Handling Method Electric hoist

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.