Self-climbing Platform SCP
TECON Self-Climbing Platform SCP is a fully enclosed motorized scaffolding system designed for high-rise structures equal to or exceeding 80m. Attached directly to the building, the integrated system utilizes synchronized electric hoists to climb or descend floor by floor autonomously. Featuring multi-layered working platforms and automated safety devices, it provides secure, weather-protected edge protection for both structural concreting and exterior façade finishing.
Features & Benefits
Self-climbing Platform SCP Features and Benefits
- Efficient Crane-Free Climbing: Operates entirely via synchronized electric hoists to eliminate tower crane dependency and accelerate construction cycles.
- Stationary Electric Hoists: Features a fixed configuration that eliminates the need to manually move heavy hoists between climbs, saving labor and operational time.
- Intelligent Safety Control: Integrated sensors continuously monitor lifting loads, triggering immediate localized alarms and automated braking if anomalies occur.
- High Component Reusability: Composed of versatile modular lengths delivering an 80 to 90 percent turnover rate across different project layouts.
- Flexible Assembly Solutions: Supports efficient ground pre-assembly or direct-on-structure installation when onsite space is highly constrained.
Self-climbing Platform SCP Application
Specially optimized for regular structural layouts in high-rise and super high-rise projects equal to or exceeding 80 m in height.
Technical Specifications
Self-climbing Platform SCP Technical Specifications
| System Type | Facade protection screen |
| Material | Climbing bracket, anchoring system, electric hoist, electronic control system |
| Standard Bracket Height | 14/16/18 m |
| Covered Floor Number | 4.5 floor |
| Working Platform Tiers | 5 floors |
| Standard Unit Size | 5 m (platform standard affects width) |
| Platform Width | 0.6 m (without side panels) |
| Platform Weight | Approx. 36 kg/m2 (without components) |
| Installation Time | 2 units/day (a group of 6 people) |
| Permissible Live Load | 2.0 kN/㎡ for 3-tier simultaneous operation 3.0 kN/㎡ for 2-tier simultaneous operation |
| Connection Technology | Cantilever beam / high-strength tie rods |
| Climbing Speed | 45 min/floor/area (Total duration including preparation and average resetting times) |
| Assembly Method | Ground level pre-assembly or direct on-structure installation |
| Handling Method | Electric hoist |
Facade Protection Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.