TECON Slab Flex 20 Formwork
The most flexible timber beam formwork for all layouts
TECON Slab Flex 20 Formwork offers flexible positioning and adjustable spacing, making it suitable for various slab structures, including flat slabs, drop-beam slabs, and irregular floor layouts. It provides a flexible and tailor solution for diverse building projects.
Features & Benefits
Slab Flex 20 Formwork Features and Benefits
- Cost-Saving – Timber beams enable fast construction with prefabricated components and remain more economical than steel due to lower installation and maintenance costs.
- Selective Components – Offers multiple plywood options including birch, hardwood, and poplar, or hollow plastic board with a service life of up to 50 uses depending on project requirements.
- Replaceable for Extended Lifespan – The H20 timber beam can be substituted with an aluminum beam to suit different construction conditions and enhance overall system durability.
- Fair-Face Exposed Concrete Quality – Film-faced plywood provides a clean, natural finish and stable support, helping achieve consistent fair-faced concrete results.
- Flexible & Adaptable – Suitable for all slab thicknesses, drop beams, irregular layouts, and complex floor plans.
Slab Flex 20 Formwork Application
Compatible with Shoring Tower TST60, Ringlock Scaffolding Slab and beams in all types of buildings, fly-over roads, bridges, tanks, parking lots, factory buildings
Technical Specifications
Slab Flex 20 Formwork Technical Specifications
| System Type | Timber Slab Formwork |
| Material | Imported spruce wood, H20 timber beam, aluminum beam, and steel accessories |
| Standard Shoring | Class D/E Heavy Duty Prop (EN 1065) |
| Size and Shape | Customized |
| Max Permissible Slab Thickness | 1000 mm |
| Installation Time | 80 m2/person/day |
| Formlining | 18/21 mm birch plywood, hardwood, and polar plywood; Hollow Plastic Board; TECON Plas-tech |
| Early Dismantle System | Optional |
| Handling Method | Manual/Tower Crane |
| Load Quantity | Around 350 m2 per 40 HQ container (with accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
