The reason for the use of aluminum alloy formworks in construction engineering The advantages of aluminum alloy formworks are increasingly recognized by more people. Aluminum alloy formworks can be recycled 150 times and are suitable for high-rise buildings to replace soft formworks. The high stiffness and strong bearing capacity of the aluminum alloy formwork system… Continue reading Reasons for Using Aluminum Alloy Formwork in Construction Engineering and Analysis of Common Installation Errors
After the construction of the bridge formwork is completed, the following items should be checked The bridge formwork, as its name suggests, is a steel formwork used in bridge projects, such as highway bridges, elevated bridges, and overpasses. The house building formwork is used in civil construction such as factories, workshops, offices, and residential buildings.… Continue reading Quality Influencing Factors and Selection Methods of Special-shaped Steel Formwork
Bridge formwork construction after the content to be checked With the development of construction industrialization and the continuous improvement of bridge formwork technology, the promotion and application of bridge formworks are constantly improving. However, when using bridge formworks, a series of problems should be paid attention to, especially after the construction is completed, the following… Continue reading Bridge Formwork Post-Construction Inspection Contents and Protective Measures
Aluminum alloy formwork is widely used in the construction industry as an environmentally friendly green product. Although it has many advantages, there are still some drawbacks that need to be improved. What are the common problems in the construction industry? How can these problems be effectively resolved? Bubbles on the surface of the concrete using… Continue reading Dealing with Issues Arising from Aluminum Alloy Formwork Construction
Measures to prevent cracks in bridge formworks One issue that often arises during the use of bridge formworks is the occurrence of cracks, which can be a major problem. To solve this problem, attention must be paid to the design of the formworks. Measures taken during the design process To prevent the occurrence of load… Continue reading Bridge Formwork Crack Prevention Measures and Precautions for Applying Release Agents
Aluminum formwork opening needs to be accurate, without punching deviation or missing punching. For aluminum formworks that are free from splicing, the following requirements must be met: accurate mold matching design to avoid on-site installation and modification of mold design, and to extend the time for assembling and repairing plates. Aluminum formwork production is accurate,… Continue reading What Are the Requirements for Aluminum Alloy Formwork Construction?
Bridge steel formwork base formwork Longitudinal 10x10cm square wood is set up on the supporting beam and nailed firmly. Large bamboo plywood with size of 2440x1220x16mm is nailed on the square wood. The formwork must be attached closely to the square wood, and the bottom longitudinal slope and height of the beam are accurately set… Continue reading How to Install Bridge Steel Formwork in Detail?
Factors to consider when using aluminum formwork Concrete poured using aluminum formwork has a good appearance and high quality due to the use of aluminum alloy material technology in manufacturing the formwork, resulting in a very smooth and flat surface that gives a good appearance to the concrete. Moreover, each component of the aluminum formwork… Continue reading Factors to Consider and Quality Assurance for the Selection of Aluminum Alloy Formwork
The new aluminum formwork has been widely applied in the current market, and the promotion and use of its products have become a trend. With the application of aluminum alloy formwork becoming more and more widespread and mature, the use of this product is becoming more standardized and standardized, and there is reliable evidence for… Continue reading Extensive Application and Construction Conditions of Innovative Aluminum Formwork in Building Industry
What should be paid attention to when producing aluminum formworks for construction? A working platform should be erected before demolition to ensure stability; The concrete strength needs to reach the design allowable value before formwork demolition; Avoid loosening and colliding with support rods when removing formworks; Clean the dirt on the formwork immediately after removing… Continue reading What Are the Considerations and Techniques to Be Aware of when Removing Aluminum Formwork in Buildings?
Steel formwork is often used in construction projects. Due to construction methods or the influence of stress intensity, steel formwork may expand and cause leakage during pouring. How to prevent steel formwork from expanding? Expansion is most likely to occur at the hole of the wall. The main reason is that the formwork is difficult… Continue reading How to Prevent Steel Formwork from Expanding and How to Assemble It?
The bridge formwork is suitable for construction sites with limited access, such as deep valleys, rapids, highway and railway interchanges, scenic spots, and nature reserves. The bridge rotation construction relies on the rotation of the structure itself to be in place, without the need for lifting equipment, which can save support wood or pier template… Continue reading Installation and Pre-stress Support Time for Pier Templates in Bridge Formwork Construction