TECON Trench box

A fast, safe, and versatile system for stable and efficient trench excavation

TECON Trench Box is a prefabricated edge support system designed to secure trench excavations and prevent soil collapse. It offers a reliable protective barrier that ensures safe working conditions during underground utility and pipeline construction. With its strong, stable structure, the Trench Box meets the safety and performance requirements of modern excavation work.

Features & Benefits

Trench Box Features and Benefits

  • Simple Operation – Three-component design enables quick, safe assembly and removal, significantly improving on-site trenching efficiency.
  • Reliable Safety Protection – Provides essential edge protection to prevent collapses and ensure a secure working environment for personnel in trenches.
  • Consistent Stability  Maintains surrounding soil and underground structure integrity, creating a stable excavation condition even in demanding sites.
  • Accurate Excavation Control – Supports precise measurement and volume estimation, helping optimize resource planning and overall construction efficiency.
  • Versatile Trenching Solution – Suitable for foundations, pipelines, municipal works, and road projects, offering flexible and efficient support across various trench applications.

Trench box Application

Foundations; utility installations; pipeline construction; road building and repair; municipal infrastructure works

Technical Specifications

Trench Box Technical Specifications

System Type Construction Tool
Weight 135 kg/m2
Max Support Depth 8 m
Max Support Width 2 m, extendable with extension tube
Permissible Bearing Capacity 27 (at least) kN/m2
Load Quantity 180 m2 per 40 OT (with accessories)

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *