< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=850590718886936&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Aluminium Prop

SHARE:

TECON Multi-purpose Aluminium Prop TMP series is a high bearing capacity shoring prop made from aluminium alloy with five different models ranging from 800mm to 6250mm.


Feature of Aluminium Prop

  • Self-cleaning threading.

  • Cast steel start collar screw.

  • Built-in safe stopping device.

  • Built-in height indication tape.

  • Powder-coated outer tube and customized colour.

  • Certification: SGS in compliance with Australian Standard.


Specification of Aluminium Prop

It is made from aluminium alloy T6061-T6.

Totally five models, TMP120, TMP250, TMP350, TMP480 & TMP625.

Prop ModelTMP120TMP250TMP350TMP480TMP625
Min.Length (mm)8001450198026004300
Max.Length (mm)12002500350048006250
A (mm)7151365186525154211
B (mm)4211071157122211975
Weight (Kg)10.415.518.723.830.2
Min~ Max Load (kN)70~9060~7042~8825~8520-56

Other related accessories are also available such as truss frame bracing TMRK, and prop connector etc.


Application of Aluminium Prop

For high shoring or bigger load bearing capacity projects.

Related Product of Aluminium Prop

Shoring Tower TST60

Heavy Duty Steel Prop

Aludeck Slab Formwork


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!