TECON Dam formwork DB180/240 is with high dependability and loading capacity for mass concrete structures without tie rod to pull through. It is widely used for forming one-sided construction projects, such as dams, run-off river power stations or navigation locks.
High load capacity without tie rod to pull through concrete structure
Can produce both single side wall and double side wall inclined
Shorten crane time due to one unit design of dam formwork
Reliable anchorage system and strong bracket strength ensures highest on site safety
Can be compatible with BASE 20 formwork, HETO Frame formwork etc.
Two pieces of dam formwork climbing bracket together with TECON wall formwork section can be assembly into one complete unit for crane lift
No tie rods needed to pull through the wall
Items | Technical details |
Available incline degree | ±45° |
Width of the formwork | 2.2m/2.4m |
Maximum pouring height | 4m |
Power unit | Tower crane |
Required crane lifting power | 30kN/unit |
Distance of retrusion | 45cm |
Anchor point load capacity | 22kN |
One-sided construction projects such as dams, run-off river power stations and navigation locks
TECON climbing formwork CB180/240, TECON self-climbing formwork TSC50/100, TECON Multi-function climbing Formwork MB180
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.