Dam Formwork DB180/240

SHARE:

TECON Dam formwork DB180/240 has high dependability and loading capacity for mass concrete structures without tie rods to pull through. It is widely used for forming one-sided construction projects, such as dams, run-off river power stations or navigation locks.

Features of Dam Formwork DB180/240

  • Shorten crane time due to one unit design of dam formwork.

  • It can produce both single side wall and double side wall inclined.

  • High load capacity without tie rod to pull through concrete structure.

  • It can be compatible with BASE 20 formwork, HETO Frame formwork and others.

  • A reliable anchorage system and muscular bracket strength ensure the highest on-site safety.


Specification of Dam Formwork DB180/240

No tie rods are needed to pull through the wall.

Two dam formwork climbing brackets and the TECON wall formwork section can be assembled into one complete unit for a crane lift.


ItemsTechnical details
Available incline degree±45°
Width of the formwork2.2m/2.4m
Maximum pouring height4m
Power unitTower crane
Required crane lifting power30kN/unit
Distance of retrusion45cm
Anchor point load capacity22kN


Application of Dam Formwork DB180/240

One-sided construction projects such as dams, run-off river power stations and navigation locks.


Related Formwork of Dam Formwork DB180/240

TECON climbing formwork CB180/240

TECON self-climbing formwork TSC50/100

TECON Multi-function climbing Formwork MB180


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.