Dam Formwork DB180/240

SHARE:

TECON Dam formwork DB180/240 is with high dependability and loading capacity for mass concrete structures without tie rod to pull through. It is widely used for forming one-sided construction projects, such as dams, run-off river power stations or navigation locks.

Features of Dam Formwork DB180/240

  • High load capacity without tie rod to pull through concrete structure

  • Can produce both single side wall and double side wall inclined

  • Shorten crane time due to one unit design of dam formwork

  • Reliable anchorage system and strong bracket strength ensures highest on site safety

  • Can be compatible with BASE 20 formwork, HETO Frame formwork etc.


Specification of Dam Formwork DB180/240

Two pieces of dam formwork climbing bracket together with TECON wall formwork section can be assembly into one complete unit for crane lift

No tie rods needed to pull through the wall


ItemsTechnical details
Available incline degree±45°
Width of the formwork2.2m/2.4m
Maximum pouring height4m
Power unitTower crane
Required crane lifting power30kN/unit
Distance of retrusion45cm
Anchor point load capacity22kN


Application of Dam Formwork DB180/240

One-sided construction projects such as dams, run-off river power stations and navigation locks


Related Formwork of Dam Formwork DB180/240

TECON climbing formwork CB180/240, TECON self-climbing formwork TSC50/100, TECON Multi-function climbing Formwork MB180

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!