< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=850590718886936&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Plastic Formwork TP60+

SHARE:

TECON Plastic formwork TP60 is recognized as the lightest formwork system due to its medium size panel design and the application of ABS (Acrylonitrile Butadiene Styrene). Besides its lightweight, it is also elementary to use even by unskilled workers. Walls, columns, slabs can be quickly and efficiently formed with only a few panel sizes and accessories.

Feature of Plastic Formwork TP60+

  • Quick clean with just water.

  • Installation without crane assistance due to its lightweight.

  • Fast and extremely easy to assemble with only a few accessories, no skilled workers required.

  • Universal application on walls, columns and slabs and others, also the modular house with one pour.


Specification of Plastic Formwork TP60+

Less or even no plaster after strip.

Different column sizes at 5cm increment start from 20cm.

It can also be used with foam concrete (lightweight concrete).

High strength and durable panels can reach up to 100 reuse times.

Up to 25cm slab thickness and 3.6m high wall by one pouring, for a maximum fresh concrete pressure of 50Kn/m2.


Main Panel size and weight

Description

Size

Unite weight

Panel TP120/60

1200x600

9.70

Panel TP40/60

400x600

3.10

Panel TP30/60

300x600

2.40

Panel TP25/60

250X600

2.10

Panel TP20/60

200x600

1.90

Panel TP18/60

180x600

1.30


Application of Plastic Formwork TP60+

Medium and small size residential and commercial buildings, basement, columns and modular houses and others, especially adapt to anti-corrosion needed project.

RELATED PRODUCTS of Plastic Formwork TP60+

Alu Lite formwork

LITE Steel Formwork

Adjustable plastic column formwork


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!