Plastic Formwork TP60+

SHARE:

TECON Plastic formwork TP60 is recognized as the lightest formwork system due to its medium size panel design and the application of ABS (Acrylonitrile Butadiene Styrene). Besides of its light weight, it is also extremely easy for use even by unskilled workers. Walls, columns, slabs can be easily and efficiently formed with only a few panel sizes and accessories.

Feature of Plastic Formwork TP60+

  • Universal application on walls, columns and slabs etc., also modular house with one pour

  • Fast and extremely easy to assemble with only a few accessories, no skilled workers required

  • Installation without crane assistance due to its light weight

  • Quick clean with just water


Specification of Plastic Formwork TP60+

High strength and durable panels can reach up to 100 reuse times

Less or even no plaster after strip

Can be also used with foam concrete (light weight concrete)

Up to 3.6m high wall by one pouring, for a maximum fresh concrete pressure of 50Kn/m2

Up to 25cm slab thickness

Different column sizes at 5cm increment start from 20cm

Main Panel size and weight

Description

Size

Unite weight

Panel TP120/60

1200x600

9.70

Panel TP40/60

400x600

3.10

Panel TP30/60

300x600

2.40

Panel TP25/60

250X600

2.10

Panel TP20/60

200x600

1.90

Panel TP18/60

180x600

1.30


Application of Plastic Formwork TP60+

Medium and small size residential and commercial buildings, basement, columns and modular houses etc., especially adapt to anti-corrosion needed project.


RELATED PRODUCTS of Plastic Formwork TP60+

LITE Steel Formwork, Adjustable plastic column formwork, Alu Lite formwork,


Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!