< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Plastic Formwork TP60

SHARE:

TECON Plastic Formwork TP60 is recognized as the lightest formwork system due to its medium panel design and the application of ABS (Acrylonitrile Butadiene Styrene). It is mainly consisted of ABS plastic panel, erection handle, alignment waler, flex beam and shoring prop. Walls, columns, slabs can be quickly and efficiently formed even by unskilled workers.

Feature of Plastic Formwork TP60

  • Fast and extremely easy as building blocks, assemble via erection handle, no skilled workers required

  • Light weight without crane assistance

  • Universal application in modular house with one pour for wall and slab together, can also cast wall, column and slab in sequence

  • Easy cleanning, less or even no plastering after strip

  • Quick delivery due to ready to ship stock



Specification of Plastic Formwork TP60

  • Main material of plastic panel is fresh ABS

  • Max panel size 1200*600mm with only 9.7 kg/pcs, other sizes are also available such as 400/350/300/250*600mm etc.

  • High strength and durable panels can reach up to 100 reuse times

  • Up to 300 mm slab thickness and 3.6 m high wall by one pouring

  • Adapt to various permissible fresh concrete pressure up to 60 kN/sqm for wall and 80 kN/sqm for column

  • It can also be used with foam/light weight concrete



Application of Plastic Formwork TP60

Small to medium size projects like row houses, villas and apartment, ground beam, swimming pool ect. Ideal solution for noice free project, anti-corrosion needed project in seashore area, remote area where heavy machinery cannot arrive.


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!