TECON Aluminium Formwork
TECON Aluminum Formwork is a modular system made from high-strength aluminum alloy, designed for fast and efficient construction of concrete structures. With its lightweight design and long service life, it is an ideal solution for residential buildings and modular housing projects requiring high productivity and consistent concrete quality.
Features & Benefits
Aluminum Formwork Features and Benefits
- High Reusability: Engineered for over 300 reuse cycles with a high recycling residual value, significantly lowering long-term project costs.
- Rapid Cycle Time: Utilises an early stripping system to achieve a fast 4 to 5 days per floor construction cycle, drastically shortening project timelines.
- Premium Concrete Finish: Delivers exceptional flatness and seamless splicing, achieving a fair-faced concrete finish that eliminates costly plastering work.
- Eco-Friendly Construction: Replaces traditional wood timber to drastically reduce construction waste and timber consumption, supporting sustainable green building.
- Safe & Crane: Free Handling-Weighing only 20kg/㎡, panels allow easy manual floor-to-floor transmission, reducing crane reliance and keeping the site clean and safe.
Aluminum Formwork Application
Widely used in medium- and small-scale residential and commercial buildings, basements, columns, and modular housing projects, especially in applications requiring corrosion resistance and high surface quality.
Technical Specifications
Aluminum Formwork Technical Specifications
| System Type | Aluminum Panel Modular System |
| Material | 6061-T6 Aluminum Alloy |
| Dimensions | 0.05×0.05 m~0.60×2.40 m |
| Max Custom Size | 0.60×3.50 m |
| Standard Shoring | Light duty prop |
| Panel Weight | 22 kg/m2~30 kg/m2 |
| Max Panel Size | 0.60×2.40 m |
| Panel Depth | 65/63.5 mm |
| Max Permissible Fresh Concrete Pressure | 50 kN/m2 |
| Max Casting Slab Thickness | 250 mm |
| Installation Time | 120~200 m2 /day |
| Handling Method | Manual/Forklift |
| Load Quantity | 936 m2 per 20 GP; 3168 m2 per 40 HQ (with pure 0.60×2.40 m panels only) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.