Spanning 606 meters with a 34-meter main span, this prestigious prestressed concrete bridge was constructed using the span-by-span method.
TECON supplied the TST60 heavy-duty shoring tower system to support the high-altitude concrete superstructure casting. Capitalizing on its exceptional single-leg load capacity, modular components, and highly adjustable height configurations, the TST60 provided a rigid, high-safety falsework platform that easily adapted to the complex sloping topography of the river valley.