Upper Tamor Hydropower Project (UTHPP) – Nepal

Dam & Wall Formwork Solution for a Major Hydropower Project

The Upper Tamor Hydropower Project (UTHPP) is a major hydropower project under construction in Taplejung District, Nepal, involving extensive dam and concrete works in a challenging mountainous environment.

TECON supplied 460 m² of Base 20 Wall Formwork and 40 sets of Dam Formwork Brackets. The engineered solution was designed for optimised material reuse, allowing formwork materials used for dam construction to be reused for foundation casting, helping improve material utilization and reduce overall formwork costs. TECON also provided on-site technical support and assembly guidance to ensure efficient and reliable formwork installation.

 

Upper Tamor Hydropower Project (UTHPP) – Nepal
Upper Tamor Hydropower Project (UTHPP) – Nepal
Upper Tamor Hydropower Project (UTHPP) – Nepal

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *

      Make an inquiry!

      Please fill out the form below and we'll contact you as soon as possible.

      Name *

      Email *

      Your Products *

      Your Country *

      Message *