This 12-story hospital project featured a regular structural design covering approximately 3,200 ㎡ of formwork area.
TECON engineered a high-coverage Slab Table Formwork solution that significantly reduced local labor costs and maximized capital efficiency through its easily reusable and rapidly deployable components.