A vital link in the China-Europe Land-Sea Express Line, this bridge project presented major technical challenges, including intricate box girder geometries and extreme loads during static testing.
TECON provided specialized pier formwork and the TST60 heavy-duty shoring system across six continuous spans to establish a rigid and reliable foundation for the superstructure.