Formwork Deployed:
HETO Frame Formwork System (432 m²)
Part of a major ongoing government transport infrastructure initiative in southern Oman, this project required the rapid erection of high retaining walls for flyover approaches.
TECON supplied 432 m² of the HETO steel-framed panel formwork system to effectively meet the demanding schedule and strict structural requirements.
High Pressure Resistance
Engineered to withstand superior concrete lateral pressures during mass pours.
Rapid Pouring Cycles
Quick-aligning clamps dramatically accelerated the highway infrastructure timeline.
Smooth Finish Results
Delivered seamless panel joints and premium concrete surface finishes.