TECON Single Side Wall Formwork SSF

TECON Single Side Formwork (SSF) is a supporting bracket system designed for single-sided concrete wall construction where tie rods cannot pass through the structure. The system transfers fresh concrete pressure safely to the supporting frame and foundation, providing a stable and efficient solution for underground and excavation-related projects.

Features & Benefits

Single Side Wall Formwork Features and Benefits

  • Efficient Crane-Assisted Assembly: Standard frame brackets enable fast and straightforward installation with crane assistance.
  • Flexible Height Configuration: Available in both standard and customized frame heights to suit different project requirements.
  • Adaptable Concrete Pressure Capacity: Frame spacing can be adjusted to accommodate varying fresh concrete pressures.
  • Easy On-Site Mobility: Integrated cast wheels allow convenient repositioning by the workforce on site.
  • Reliable System Compatibility: Fully compatible with TECON wall formwork systems and can be reinforced with G.I. pipes and couplers for enhanced stability.

Single Side Wall Formwork Application

Widely used in single-sided wall construction for metro stations, sewage treatment plants, basements, and excavation projects.

Technical Specifications

Single Side Wall Formwork Technical Specifications

System Type Supporting Bracket System
Material Q235 Steel Profile
Standard Bracket Height 4/2.2/1.5 m
Standard Unit Size 2 m
Max One-time Casting Height 8.0m
Anchorage Pull-out Resistance Minimum 150 kN
Installation Time 10 units/day (a group of 6 people)
Connection Technology Ground anchor
Handling Method Wheel transport (horizontal) / crane lifting

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *