TECON Single Side Wall Formwork SSF
TECON Single Side Formwork (SSF) is a supporting bracket system designed for single-sided concrete wall construction where tie rods cannot pass through the structure. The system transfers fresh concrete pressure safely to the supporting frame and foundation, providing a stable and efficient solution for underground and excavation-related projects.
Features & Benefits
Single Side Wall Formwork Features and Benefits
- Efficient Crane-Assisted Assembly: Standard frame brackets enable fast and straightforward installation with crane assistance.
- Flexible Height Configuration: Available in both standard and customized frame heights to suit different project requirements.
- Adaptable Concrete Pressure Capacity: Frame spacing can be adjusted to accommodate varying fresh concrete pressures.
- Easy On-Site Mobility: Integrated cast wheels allow convenient repositioning by the workforce on site.
- Reliable System Compatibility: Fully compatible with TECON wall formwork systems and can be reinforced with G.I. pipes and couplers for enhanced stability.
Single Side Wall Formwork Application
Widely used in single-sided wall construction for metro stations, sewage treatment plants, basements, and excavation projects.
Technical Specifications
Single Side Wall Formwork Technical Specifications
| System Type | Supporting Bracket System |
| Material | Q235 Steel Profile |
| Standard Bracket Height | 4/2.2/1.5 m |
| Standard Unit Size | 2 m |
| Max One-time Casting Height | 8.0m |
| Anchorage Pull-out Resistance | Minimum 150 kN |
| Installation Time | 10 units/day (a group of 6 people) |
| Connection Technology | Ground anchor |
| Handling Method | Wheel transport (horizontal) / crane lifting |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13507532707.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.