< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Climbing Formwork CB180/240

SHARE:

TECON Climbing formwork CB180/240 has consisted of a formwork panel, climbing bracket, shaft platform beam and anchoring system. With the assistance of a tower crane or mobile crane, it can jump to the next pouring height for the core wall or external walls.

Features of Climbing Formwork CB180/240

Reliable & high-safety thanks to the anchorage system.

With just one crane lift, the complete set can reach the next pouring height.

It can work with different TECON wall shuttering systems such as BASE 20, HETO Frame and others.

It offers the site a speedy poring cycle for the vertical structure, with no need to go upwards with a horizontal structure.


Specification of Climbing Formwork CB180/240

Up to 4.5m permitted pouring height each time.

3-5 platforms design for more convenient and efficient work.

Up to 2.4m central platform provides sufficient space for workers.

Retraction of formwork panel up to 750mm allows its cleanings on the shuttering.


Application of Climbing Formwork CB180/240

High rise buildings, bridge piers, water tanks, LNG tanks and others.


Related Formwork of Climbing Formwork CB180/240

TECON self-climbing formwork

TECON dam formwork DB180/240

Multi-function Climbing Formwork MB180


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!