+86-(0)512-65650586
info@teconform.com
English
Suzhou TECON Construction Technology Co., Ltd

Protection Screen

SHARE:

TECON Protection Screen is a modular designed facade protection system, automatic climbing by mobile hydraulic cylinder system. It provides maximum three floors coverage with optional numbers of platform. Safe, efficient and weather regardless operation condition is hence guaranteed at your minimum cost.

Feature of Protection Screen

Independent self-climbing system saves crane usage during the whole phase protection for site crews

Customized storey heights and platform numbers meet different projects requirement.

Full sealed outer protection leads to perfect façade appearance, while it also ensures safe operation condition

Embedded anchor system ensures firm attaching to the concrete structure

Modular unit design means universal utilization among different projects


Specification of Protection Screen

Rail-guided platform climbs through climbing shoes attached into concrete

2.5 to 3.5 floors coverage height available, maximum 14 meters

1 meter platform width from structure

0.75kn/sqm loading capacity of platform during formwork operation and concrete maintenance

1 to 4 floors platform available in specific project

±10°backwards, forwards, right and left tilting angle


Related Products of Protection Screen

Self-climbing platform SCP, Self-climbing formwork TSC50/100, Jump formwork CB240, Ringlock Scaffolding

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Search Now or Make an inquiry!
Search Now or Make an inquiry!