< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=850590718886936&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Protection Screen

SHARE:

TECON Protection Screen is a modular designed facade protection system, automatic climbing by mobile hydraulic cylinder system. It provides a maximum of three floors coverage with optional numbers of the platform. Safe, efficient and weather regardless operation condition is hence guaranteed at your minimum cost.

Feature of Protection Screen

Modular unit design means universal utilization among different projects.An embedded anchor system ensures firm attaching to the concrete structure.Customized storey heights and platform numbers meet different projects requirement.Independent self-climbing system saves crane usage during the whole phase protection for site crews.Full sealed outer protection leads to a perfect façade appearance, while it also ensures safe operating conditions.


Specification of Protection Screen

  • 1-meter platform width from the structure.

  • 1 to 4 floors platform available in specific project.

  • ±10°backwards, forwards, right and left tilting angle.

  • 2.5 to 3.5 floors coverage height available, maximum 14 meters.

  • Rail-guided platform climbs through climbing shoes attached to the concrete.

  • 0.75kn/sqm loading capacity of the platform during formwork operation and concrete maintenance.


Related Products of Protection Screen

Ringlock Scaffolding

Jump formwork CB240

Self-climbing platform SCP

Self-climbing formwork TSC50/100


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!