TECON Light Duty Prop
TECON Light Duty Prop is a lightweight and economical shoring solution designed for residential and light industrial construction projects. With its efficient price-performance ratio, the system provides practical and reliable support for applications where heavy-duty load requirements are not necessary.
Features & Benefits
Light Duty Prop Features and Benefits
- Designed for Light-Duty Applications – Ideal for residential slabs, interior support, and other low-load construction requirements.
- Lightweight & Easy Handling – Lightweight structure allows fast transportation, installation, and dismantling on site.
- Cost-Effective Shoring Solution – Provides an excellent balance between performance and cost for economical project execution.
- Simple Height Adjustment – Telescopic design combined with a smooth cast iron adjustment nut enables quick and convenient height regulation.
Light Duty Prop Application
Widely used in residential buildings, light industrial projects, slab support, and temporary interior shoring applications.
Technical Specifications
Light Duty Prop Technical Specifications
| System Type | Steel shoring props | |
| Load Capacity | 10 kN | |
| Diameter | Ø60/48 mm | |
| Surface Treatment | Powder coated | |
| Model Type | Adjustable Range | Weight |
| Light Duty Prop 25 | 1500-2500 mm | 9.99 kg |
| Light Duty Prop 30 | 1750-3000 mm | 11.27 kg |
| Light Duty Prop 35 | 2000-3500 mm | 12.55 kg |
| Light Duty Prop 40 | 2250-4000 mm | 13.85 kg |
Formwork Accessories Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.