Supporting a high-density urban flood-alleviation canal extension, TECON supplied 345 m² of the ALUMI aluminum-frame wall formwork system.
The panels feature precision-engineered, pre-fabricated tie rod openings that dramatically accelerated assembly, allowing a two-man crew to achieve a remarkable daily installation rate of 150 m².
The high-accuracy robotic welding of the aluminum frames yielded exceptionally flat, smooth concrete surfaces with minimal joint lines, delivering premium durability and excellent long-term asset value.