TECON Slab Table Formwork
Highly efficient and customized tables for large-area slabs
TECON Slab Table Formwork is easy and practical to set up, allowing for quick adjustments and relocations as a cohensive unit. As a result, it offers a cost-effective and efficient solution for constructing large-area slab structures with minimal beam usage.
Features & Benefits
Slab Table Formwork Features and Benefits
- Labor & Time Savings – Large table units (up to 4×6 m) enable rapid setup, stripping, and pre-assembly, while being easily relocated with a trolley or crane to the next casting area.
- Optimized Space – Fewer beams create wider, column-free spans, while pre-assembled units enhance on-site safety.
- Optional Material Choices – TECON-Form Plywood is available in birch, hardwood, poplar, hollow plastic board or TECON-Form Plas-tech (up to 50 uses). H20 timber beams can be replaced with aluminum for extended lifespan across different projects.
- Consistent Surface Finish – produces smooth, even concrete surfaces with natural depth and subtle stone-like texture, ensuring high-quality fair-faced results.
- Strong Adaptability – Compatible with TECON Shoring Tower TST60 for heights up to 20 m, making it suitable for high-rise, super high-rise, and minimal-beam structural projects.
Slab Table Formwork Application
Large area floor project; minimal beam structures; high rise buildings; skyscraper; factory buildings
Technical Specifications
Slab Table Formwork Technical Specifications
| System Type | Timber Slab Formwork |
| Material | Imported spruce wood, H20 timber beam, aluminum beam, and steel accessories |
| Standard Shoring | Class D/E Heavy Duty Prop (EN 1065) |
| Max. Unit Size | 4×6 m |
| Max Permissible Slab Thickness | 1000 mm |
| Installation Time | 200 m2/day/unit (5 people) |
| Formlining | 18/21 mm TECON-Form birch plywood, hardwood, and polar plywood;
Hollow Plastic Board TECON-Form Plas-tech |
| Handling Method | Trolley/Tower Crane |
| Load Quantity | Around 300 m2 per 40 HQ container (with accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.
