TECON Slab Table Formwork

Highly efficient and customized tables for large-area slabs

TECON Slab Table Formwork is easy and practical to set up, allowing for quick adjustments and relocations as a cohensive unit. As a result, it offers a cost-effective and efficient solution for constructing large-area slab structures with minimal beam usage.

Features & Benefits

Slab Table Formwork Features and Benefits

  • Labor & Time Savings – Large table units (up to 4×6 m) enable rapid setup, stripping, and pre-assembly, while being easily relocated with a trolley or crane to the next casting area.
  • Optimized Space  Fewer beams create wider, column-free spans, while pre-assembled units enhance on-site safety.
  • Optional Material Choices – TECON-Form Plywood is available in birch, hardwood, poplar, hollow plastic board or TECON-Form Plas-tech (up to 50 uses). H20 timber beams can be replaced with aluminum for extended lifespan across different projects.
  • Consistent Surface Finish – produces smooth, even concrete surfaces with natural depth and subtle stone-like texture, ensuring high-quality fair-faced results.
  • Strong Adaptability – Compatible with TECON Shoring Tower TST60 for heights up to 20 m, making it suitable for high-rise, super high-rise, and minimal-beam structural projects.

Slab Table Formwork Application

Large area floor project; minimal beam structures; high rise buildings; skyscraper; factory buildings

Technical Specifications

Slab Table Formwork Technical Specifications

System Type Timber Slab Formwork
Material Imported spruce wood, H20 timber beam, aluminum beam, and steel accessories
Standard Shoring Class D/E Heavy Duty Prop (EN 1065)
Max. Unit Size 4×6 m
Max Permissible Slab Thickness 1000 mm
Installation Time 200 m2/day/unit (5 people)
Formlining 18/21 mm TECON-Form birch plywood, hardwood, and polar plywood;

Hollow Plastic Board

TECON-Form Plas-tech

Handling Method Trolley/Tower Crane
Load Quantity Around 300 m2 per 40 HQ container (with accessories)

Slab Table Formwork 3D Assembly Tutorial

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *