TECON H20 Timber Beam

TECON H20 Timber Beam is made from high-quality spruce imported from Northern Europe, ensuring high load-bearing capacity and stability. It can be cut into various sizes to meet different site needs and complies with EN 13377 standards, making it widely used in girder-based formwork systems such as wall, slab, and column formwork.

Features & Benefits

H20 Timber Beam Features and Benefits

  • Manufactured to EN 13377 Standards – Produced in accordance with EN 13377 standards to ensure consistent quality and reliable structural performance.
  • Protected Beam Ends – Plastic or steel end caps help minimize damage during transportation and handling, extending the beam service life.
  • High Load-Bearing Capacity – Featuring a 200 mm beam height and imported European spruce flanges for excellent strength and structural stability.
  • Flexible Length Configuration – Available in multiple standard lengths, customizable up to 6 m, and extendable with beam splices to meet varying project requirements.

H20 Timber Beam Application

Can be used as both primary and secondary beams in wall, slab, column, and other girder-based formwork systems.

Technical Specifications

H20 Timber Beam Technical Specifications

System Type0 Girder
Length 1.5, 1.9, 2.45, 2.60, 2.90, 3.00, 3.30, 3.60, 3.80, 4.50, 5.00, 5.90 m
Customized*
Height 20 cm
Weight 4.9 kg/m
Allowed Shear Resistance 11 kN
Allowed Bending Resistance 5 kN·m
Allowed Bearing Resistance 22 kN
Wood moisture 12% +/- 4% at delivery
Load Quantity 105 pieces per pallet

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *