TECON H20 Timber Beam
TECON H20 Timber Beam is made from high-quality spruce imported from Northern Europe, ensuring high load-bearing capacity and stability. It can be cut into various sizes to meet different site needs and complies with EN 13377 standards, making it widely used in girder-based formwork systems such as wall, slab, and column formwork.
Features & Benefits
H20 Timber Beam Features and Benefits
- Manufactured to EN 13377 Standards – Produced in accordance with EN 13377 standards to ensure consistent quality and reliable structural performance.
- Protected Beam Ends – Plastic or steel end caps help minimize damage during transportation and handling, extending the beam service life.
- High Load-Bearing Capacity – Featuring a 200 mm beam height and imported European spruce flanges for excellent strength and structural stability.
- Flexible Length Configuration – Available in multiple standard lengths, customizable up to 6 m, and extendable with beam splices to meet varying project requirements.
H20 Timber Beam Application
Can be used as both primary and secondary beams in wall, slab, column, and other girder-based formwork systems.
Technical Specifications
H20 Timber Beam Technical Specifications
| System Type0 | Girder |
| Length | 1.5, 1.9, 2.45, 2.60, 2.90, 3.00, 3.30, 3.60, 3.80, 4.50, 5.00, 5.90 m Customized* |
| Height | 20 cm |
| Weight | 4.9 kg/m |
| Allowed Shear Resistance | 11 kN |
| Allowed Bending Resistance | 5 kN·m |
| Allowed Bearing Resistance | 22 kN |
| Wood moisture | 12% +/- 4% at delivery |
| Load Quantity | 105 pieces per pallet |
Formwork Accessories Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.