TECON Adjustable HETO Frame Column Formwork
One panel fits hundreds of column sizes maximizing versatility with minimal components.
TECON Adjustable HETO Frame Column Formwork is an efficient and reliable solution, featuring robust steel-framed HM panels, dedicated column couplers, and adjustable struts for stable and precise column forming. Its adjustable design allows dozens of column sizes to be formed with a single HM panel set, maximizing reuse and reducing site labor.
Features & Benefits
Adjustable HETO Frame Column Formwork Features and Benefits
- Universal connection system – One column clamp works for all panel connections, simplifying assembly.
- Easy to clean – High-temperature powder-coated frame ensures easy cleaning and long-lasting performance.
- Adjustable Column Formwork Panels – HM panels fit over a hundreds rectangular column sizes in 50 mm increments.
- TECON Film-Faced Birch Plywood – Durable and replaceable, designed for 30–50 uses, delivers a smooth and flawless concrete surface after dismantling.
- Standard usage – Suitable for most column sizes, it can also be used for wall structures, offering greater versatility and flexibility on site.
Technical Specifications
Adjustable HETO Frame Column Formwork Technical Specifications
| System Type | Steel Panel Column Formwork |
| Material | Q355 Steel Profile |
| Dimensions | HM Panel heights: 3.0, 2.4, 1.5, 1.2 m Panel Widths: 0.9, 0.75, 0.5, 0.35 m |
| Panel Weight | 40 kg/m2 |
| Max Panel Size | 3*0.9 m |
| Panel Depth | 73 mm |
| Max Permissible Fresh Concrete Pressure | 80 kN/m2 |
| Column Size | From 200 × 200 mm to 750 × 750 mm with 50
mm increments |
| Installation Time | 100 m2/2 person/day |
| Formlining | 15 mm TECON-Form birch plywood (12 mm option available*) |
| Connection Technology | Column Couplers |
| Handling Method | Tower Crane |
| Load Quantity | Around 45 sets per 40HQ container (with 3 × 0.9 m panels and accessories) |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.