+86-(0)512-65650586
info@teconform.com
English
Suzhou TECON Construction Technology Co., Ltd

V-shore Frame

SHARE:

V-Shore Frame Scaffolding is a high load conventional shoring system which is consisted by three major components, frames, cross braces, top & base jacks. Simple combination offer site easy erection and dismantle. All the material can be stacked and stored in order. Wide shoring application in multiplex projects.

Features of V-shore Frame

  • Can reach different shoring height by the combination of different size frames
    Distance between frames can be adjusted with different sizes of braces in order to achieve different loads
    35.1kN work load capacity for each leg.

  • Easy and compact for transportation and storage

  • Less maintenance in the future application


Specification of V-shore Frame

No.

Items

Size

Description

1

V Shore Frame


1219*2130(W*H)

60*3.5-Q345


2

1219*1829 (W*H)

3

1219*1524 (W*H)

4

1219*1219(W*H)

5

1219*914(W*H)

11

Cross Brace

1829*914                

Q235 / ø27*1.8

12

1829*1219    

13

1524*914

14

1524*1219                  

15

1219*914            

16

1219*1219        

17

Fork Head Jack

L=800

Q235 / M50*4 / Cast steel nut

18

Base Jack

L=800

Q235 / M50*4 / Cast steel nut

19

Base Plate

L=150

M50*4

20

Connector #1

/

ø48*3


Application of V-shore Frame

Residential and commercial buildings, bridges, and other heavy slabs or beams


Related products of V-shore Frame

TECON Ringlock Scaffolding, TECON Multi-purpose Prop, TECON Shoring Tower ST60.

  • Ringlock Scaffolding

    Ringlock Scaffolding

    TECON Scaffold Ringlock is designed & manufactured to be the most convenient and efficient...
  • Aluminium Prop

    Aluminium Prop

    TECON Multi-purpose Aluminium Prop TMP series is a high bearing capacity shoring prop.
  • Shoring Tower TST60

    Shoring Tower TST60

    TECON Shoring Tower TST60 is the fast assembly and cost-effective supporting frame system ...
Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Search Now or Make an inquiry!
Search Now or Make an inquiry!