V-Shore Frame Scaffolding is a high load conventional shoring system consisting of three major components: frames, cross braces, top & base jacks. This simple combination offers site-ready easy erection and dismantle. All the materials can be stacked and stored in order. The V-shore frame has wide application in multiplex projects.
Less maintenance in the future application.
Easy and compact for transportation and storage.
Can reach different shoring heights by the combination of different size frames.
Distance between frames can be adjusted with different braces to achieve other loads 35.1kN workload capacity for each leg.
No. | Items | Size | Description |
1 | V Shore Frame | 1219*2130(W*H) | 60*3.5-Q345 |
2 | 1219*1829 (W*H) | ||
3 | 1219*1524 (W*H) | ||
4 | 1219*1219(W*H) | ||
5 | 1219*914(W*H) | ||
11 | Cross Brace | 1829*914 | Q235 / ø27*1.8 |
12 | 1829*1219 | ||
13 | 1524*914 | ||
14 | 1524*1219 | ||
15 | 1219*914 | ||
16 | 1219*1219 | ||
17 | Fork Head Jack | L=800 | Q235 / M50*4 / Cast steel nut |
18 | Base Jack | L=800 | Q235 / M50*4 / Cast steel nut |
19 | Base Plate | L=150 | M50*4 |
20 | Connector #1 | / | ø48*3 |
Residential and commercial buildings, bridges, and other heavy slabs or beams.
TECON Multi-purpose Prop
TECON Ringlock Scaffolding
TECON Shoring Tower ST60
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.