V-Shore Frame Scaffolding is a high load conventional shoring system which is consisted by three major components, frames, cross braces, top & base jacks. Simple combination offer site easy erection and dismantle. All the material can be stacked and stored in order. Wide shoring application in multiplex projects.
Can reach different shoring height by the combination of different size frames
Distance between frames can be adjusted with different sizes of braces in order to achieve different loads
35.1kN work load capacity for each leg.
Easy and compact for transportation and storage
Less maintenance in the future application
No. | Items | Size | Description |
1 | V Shore Frame | 1219*2130(W*H) | 60*3.5-Q345 |
2 | 1219*1829 (W*H) | ||
3 | 1219*1524 (W*H) | ||
4 | 1219*1219(W*H) | ||
5 | 1219*914(W*H) | ||
11 | Cross Brace | 1829*914 | Q235 / ø27*1.8 |
12 | 1829*1219 | ||
13 | 1524*914 | ||
14 | 1524*1219 | ||
15 | 1219*914 | ||
16 | 1219*1219 | ||
17 | Fork Head Jack | L=800 | Q235 / M50*4 / Cast steel nut |
18 | Base Jack | L=800 | Q235 / M50*4 / Cast steel nut |
19 | Base Plate | L=150 | M50*4 |
20 | Connector #1 | / | ø48*3 |
Residential and commercial buildings, bridges, and other heavy slabs or beams
TECON Ringlock Scaffolding, TECON Multi-purpose Prop, TECON Shoring Tower ST60.
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.