< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Acrow Prop

SHARE:

TECON Acrow Prop is designed with 5 sizes ranging from 1060mm to 4900mm with axial bearing load limits from 7kN to 42.5 kN. TECON Acrow Prop is widely used in certain region of the world such as Australia.

Features of Acrow Prop

  • Following AS 3610 standard

  • Cast steel nut

  • Fully rolled thread on an outer tube directly

  • Powder Coating and hot-dip galvanization finishing for option



Specifications of Acrow Prop

  • Outer and inner diameter 60.3 mm and 48.3 mm

  • Inner tube is made from high tensile steel profiles Q355

ModelAdjustable
Range
(mm)
Outer tube
(mm)
Inner tube
(mm)
Unit
Weight
(kg)
ACW001060-183060.3×2.848.3×3.512.38
ACW011610-280060.3×2.848.3×3.516.25
ACW021910-340060.3×2.848.3×3.518.57
ACW032180-394060.3×3.048.3×3.521.21
ACW043110-490060.3×3.248.3×4.227.78



Application of Acrow Prop

    Applied and used in Australian markets.


  • Heavy Duty Steel Prop

    Heavy Duty Steel Prop

    Heavy Duty Steel Prop TEP-D & TEP-E series refers to TECON high bearing capacity steel pro...
  • Light Duty Prop

    Light Duty Prop

    TEP-B props are widely used where there asks for economic solution and no special requirem...
Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!