TECON Multi-purpose Aluminum Prop TMP

TECON Multi-Purpose Aluminum Prop TMP Series is a high-capacity shoring system manufactured from durable aluminum alloy. Designed with five height configurations and integrated height indication tape, the TMP prop provides efficient, accurate, and reliable support for high shoring and heavy-load construction applications.

Features & Benefits

Multi-purpose Aluminum Prop Features and Benefits

  • Fast & Clean Height Adjustment – Self-cleaning thread design ensures smooth adjustment even under concrete residue and harsh site conditions.
  • Integrated Safety & Preset Features – Built-in height indication tape and safety stop help prevent over-extension while improving setup efficiency and operational safety.
  • Wide Height Adaptability – Five prop models cover working heights from approximately 800 mm to 6,250 mm for flexible project application.
  • High Load-Bearing Performance – Engineered to provide reliable support capacity for slab formwork and other heavy-duty structural applications.
  • Lightweight Aluminum Construction – Aluminum alloy design reduces handling weight while maintaining high structural strength and corrosion resistance.

Multi-purpose Aluminum Prop Application

Widely used in slab formwork support, high shoring systems, and heavy-load structural support applications.

Technical Specifications

Multi-purpose Aluminum Prop Technical Specifications

System Type Aluminum shoring props
Material 6061-T6/6082-T6 aluminum alloy
Surface Treatment Powder coated
Model Type Adjustable Range Weight Load Capacity
TMP 120 800-1200 mm 11.3 kg 70-90 kN
TMP 250 1450-2500 mm 16 kg 60-70 kN
TMP 350 1950-3500 mm 20.1 kg 42-88 kN
TMP 480 2600-4800 mm 25.4 kg 25-85 kN
TMP 625 4300-6250 mm 31.8 kg 20-56 kN

Your burning questions, answered

How to get a quotation?

You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.

Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.

What is the payment term?

By T/T or L/C.

What is the lead time?

For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

For other systems, the lead time is from 30 to 45 days.

For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.

    Make an inquiry!

    Please fill out the form below and we'll contact you as soon as possible.

    Name *

    Email *

    Your Products *

    Your Country *

    Message *