TECON Multi-purpose Aluminum Prop TMP
TECON Multi-Purpose Aluminum Prop TMP Series is a high-capacity shoring system manufactured from durable aluminum alloy. Designed with five height configurations and integrated height indication tape, the TMP prop provides efficient, accurate, and reliable support for high shoring and heavy-load construction applications.
Features & Benefits
Multi-purpose Aluminum Prop Features and Benefits
- Fast & Clean Height Adjustment – Self-cleaning thread design ensures smooth adjustment even under concrete residue and harsh site conditions.
- Integrated Safety & Preset Features – Built-in height indication tape and safety stop help prevent over-extension while improving setup efficiency and operational safety.
- Wide Height Adaptability – Five prop models cover working heights from approximately 800 mm to 6,250 mm for flexible project application.
- High Load-Bearing Performance – Engineered to provide reliable support capacity for slab formwork and other heavy-duty structural applications.
- Lightweight Aluminum Construction – Aluminum alloy design reduces handling weight while maintaining high structural strength and corrosion resistance.
Multi-purpose Aluminum Prop Application
Widely used in slab formwork support, high shoring systems, and heavy-load structural support applications.
Technical Specifications
Multi-purpose Aluminum Prop Technical Specifications
| System Type | Aluminum shoring props | ||
| Material | 6061-T6/6082-T6 aluminum alloy | ||
| Surface Treatment | Powder coated | ||
| Model Type | Adjustable Range | Weight | Load Capacity |
| TMP 120 | 800-1200 mm | 11.3 kg | 70-90 kN |
| TMP 250 | 1450-2500 mm | 16 kg | 60-70 kN |
| TMP 350 | 1950-3500 mm | 20.1 kg | 42-88 kN |
| TMP 480 | 2600-4800 mm | 25.4 kg | 25-85 kN |
| TMP 625 | 4300-6250 mm | 31.8 kg | 20-56 kN |
Formwork Accessories Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.