Heavy Duty Steel Prop

SHARE:

Heavy Duty Steel Prop TEP-D & TEP-E series refers to TECON high bearing capacity steel props, they are the most strong and compatible steel props used in various slab formwork, table formwork etc. In the meantime, they minimize the consumption due to its high load.

Feature of Heavy Duty Steel Prop

  • High load capacity thus less props required

  • Hot-dip galvanization finishing ensures longer service life

  • With reference to EN1065 standard


Specification of Heavy Duty Steel Prop

TEP-D represents props with work load at 20kN

TEP-E represents props with work load at 30kN

Up to 5.5m shoring height

1.7 times safety factor calculated

Outer Dimension:76.1mm / 63.5mm (high tensile steel Q345))

Cast steel nut


Application of Heavy Duty Steel Prop

In various kind of slab formwork supporting


Related Product of Heavy Duty Steel Prop

Acrow Prop, Light Duty Prop, Multi-purpose Aluminium Prop

  • Aluminium Prop

    Aluminium Prop

    TECON Multi-purpose Aluminium Prop TMP series is a high bearing capacity shoring prop.
Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!