< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=850590718886936&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Heavy Duty Steel Prop

SHARE:

Heavy Duty Steel Prop TEP-D & TEP-E series refers to TECON high bearing capacity steel props. They are the most robust and compatible steel props used in various slab formwork, table formwork and more. They have the additional benefit of requiring less because of their high load capacity.


Feature of Heavy Duty Steel Prop

  • Regarding EN1065 standard.

  • High load capacity; thus, more minor props are required.

  • Hot-dip galvanization finishing ensures longer service life.


Specification of Heavy Duty Steel Prop

Cast steel nut.

Up to 5.5m shoring height.

1.7 times safety factor calculated.

TEP-D represents props with a workload of 20kN.

TEP-E represents props with a workload of 30kN.

Outer Dimension:76.1mm / 63.5mm (high tensile steel Q345)).


Application of Heavy Duty Steel Prop

Supporting various kinds of slab work.

In various kinds of slab formwork supporting.

Related Product of Heavy Duty Steel Prop

Acrow Prop

Light Duty Prop

Multi-purpose Aluminium Prop


  • Aluminium Prop

    Aluminium Prop

    TECON Multi-purpose Aluminium Prop TMP series is a high bearing capacity shoring prop.
Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!