TECON-Form Plastic Board
TECON-Form Plastic Board is a durable and cost-efficient shuttering panel designed for concrete formwork applications. Offering smooth concrete finishes and extended service life, it provides a highly economical alternative to conventional film faced plywood by reducing the average cost per reuse cycle. The system is suitable for wall, column, and slab formwork applications across various construction projects.
Features & Benefits
TECON-Form Plastic Board Features and Benefits
- Cost-Efficient Reusable Solution – Extended service life significantly lowers the average cost per use, making it an economical choice for repetitive shuttering applications.
- Alternative to Film Faced Plywood – An ideal replacement for conventional plywood with improved durability and consistent performance.
- Smooth Concrete Surface Finish – Provides cleaner and smoother concrete finishing without requiring release agents under normal conditions.
- Weather-Resistant & Recyclable – Suitable for both tropical and cold-weather concreting environments while supporting recyclable and environmentally friendly usage.
- Versatile System Compatibility – Compatible with both girder formwork systems and framed formwork systems for flexible site application.
TECON-Form Plastic Board Application
Widely used in wall, column, slab, and other concrete shuttering projects utilizing girder or frame formwork systems.
Technical Specifications
TECON-Form Plastic Board Options
| Plastic Board Series | Nominated Thickness | Sizes | Approximate Uses |
| System Type | Shuttering Boards | ||
| TECON-Form WPC | 15/18/21mm | 1220×2440 mm 915×1830 mm |
20-40 times |
| TECON-Form Plastic Board | 12/15/18/20 mm | 1220×2440 mm 915×1830 mm |
50-100 times |
Formwork Accessories Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
How to get a quotation?
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
What is the payment term?
By T/T or L/C.
What is the lead time?
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don’t hesitate to contact us for a specific product based on your quantity.