+86-(0)512-65650586
info@teconform.com
English
Suzhou TECON Construction Technology Co., Ltd

TECON-Form Plastic Board

SHARE:

TECON-Form Plastic Board series are consists of Cellular Board, Plas-film Board and high end Plas-tech Board. With different material, and manufacturing process, TECON-Form Plastic Board series are getting more and more popular due to much better performance in concrete finishing and much lower cost in each use.

Feature of TECON-Form Plastic Board

  • Much longer service life, much lower cost per use

  • Better concrete finishing than normal marine board

  • Can be saw, nailed, same using method

  • Without worrying delamination even in rainy season during concreting

  • Can be recycled thus environmental friendly  

  • Versatile usage in formwork system in both girder system and framed system


Specification of TECON-Form Plastic Board

Size

1220*2440*10/12/15/18/21mm,

Customized sizes are available such as 1500*2700mm, 1500*3000mm etc for formwork frame use


Panel series

TECON-Form Cellular Board          minimum 30 times uses

TECON-Form Plas-film Board         minimum 30 times uses

TECON-Form Plas-tech Board         minimum 100 times uses    *long fiber glass added


*All above use time is evaluated by 18mm thickness board based on normal maintenance


Application of TECON-Form Plastic Board

Different shuttering area using with formwork girders or formwork frames etc.


Related Product of TECON-Form Plastic Board

TECON-Form Film Faced Plywood, H20 Timber beam, Aluminium I beam

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Search Now or Make an inquiry!
Search Now or Make an inquiry!