TECON-Form Plastic Board series consists of Cellular Board, Plas-film Board and high-end Plas-tech Board. With different materials and manufacturing processes, the TECON-Form Plastic Board series is growing ever popular due to much-improved performance in concrete finishing and much lower cost in each use.
It can be sawn and nailed, same using method.
It can be recycled, thus environmental friendly.
Much longer service life, much lower cost of each use.
Better concrete finishing than the regular marine board.
Delamination is not affected even in rainy climates during concreting.
Versatile use in formwork system in both girder system and framed system.
1220*2440*10/12/15/18/21mm,
Customized sizes are available, such as 1500*2700mm, 1500*3000mm and more, for formwork frame use.
TECON-Form Cellular Board
minimum 30 times uses TECON-Form Plas-film Board
minimum 30 times uses TECON-Form Plas-tech Board
minimum 100 times uses *long fiber glass added
*All above use time is evaluated by the 18mm thickness board based on regular maintenance.
Different shuttering areas using formwork girders or formwork frames and others.
H20 Timber beam
Aluminium I beam
TECON-Form Film Faced Plywood
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.