TECON-Form Plastic Board series are consists of Cellular Board, Plas-film Board and high end Plas-tech Board. With different material, and manufacturing process, TECON-Form Plastic Board series are getting more and more popular due to much better performance in concrete finishing and much lower cost in each use.
Much longer service life, much lower cost per use
Better concrete finishing than normal marine board
Can be saw, nailed, same using method
Without worrying delamination even in rainy season during concreting
Can be recycled thus environmental friendly
Versatile usage in formwork system in both girder system and framed system
1220*2440*10/12/15/18/21mm,
Customized sizes are available such as 1500*2700mm, 1500*3000mm etc for formwork frame use
TECON-Form Cellular Board minimum 30 times uses
TECON-Form Plas-film Board minimum 30 times uses
TECON-Form Plas-tech Board minimum 100 times uses *long fiber glass added
*All above use time is evaluated by 18mm thickness board based on normal maintenance
Different shuttering area using with formwork girders or formwork frames etc.
TECON-Form Film Faced Plywood, H20 Timber beam, Aluminium I beam
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.