< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=850590718886936&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON-Form Plastic Board

SHARE:

TECON-Form Plastic Board series consists of Cellular Board, Plas-film Board and high-end Plas-tech Board. With different materials and manufacturing processes, the TECON-Form Plastic Board series is growing ever popular due to much-improved performance in concrete finishing and much lower cost in each use.


Feature of TECON-Form Plastic Board

  • It can be sawn and nailed, same using method.

  • It can be recycled, thus environmental friendly.

  • Much longer service life, much lower cost of each use.

  • Better concrete finishing than the regular marine board.

  • Delamination is not affected even in rainy climates during concreting.

  • Versatile use in formwork system in both girder system and framed system.

Specification of TECON-Form Plastic Board

Size

1220*2440*10/12/15/18/21mm,

Customized sizes are available, such as 1500*2700mm, 1500*3000mm and more, for formwork frame use.


Panel series

TECON-Form Cellular Board          

minimum 30 times uses TECON-Form Plas-film Board        

minimum 30 times uses TECON-Form Plas-tech Board      

 minimum 100 times uses    *long fiber glass added


*All above use time is evaluated by the 18mm thickness board based on regular maintenance.


Application of TECON-Form Plastic Board

Different shuttering areas using formwork girders or formwork frames and others.


Related Product of TECON-Form Plastic Board

H20 Timber beam

Aluminium I beam

TECON-Form Film Faced Plywood


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!