PVC Pipe & Cone

SHARE:
  • Slab Flex 20 Formwork

    Slab Flex 20 Formwork

    TECON Slab Flex 20 formwork is the most flexible slab formwork. It's highly optimum for mu...
  • TECON Big Plate Nut

    TECON Big Plate Nut

    TECON Big Plate Nut and Butterfly Wing Nut are made from cast iron, with 110mm diameter ...
  • Light Duty Prop

    Light Duty Prop

    TEP-B props are widely used where there asks for economic solution and no special requirem...
Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!