TECON Single Side Wall Formwork

SHARE:

TECON single side formwork or SSF is a standard formwork supporting bracket system, which is specially designed for transferring fresh concrete side pressure to support frame and concrete foundations, and without any tie rod being pulled through the wall.


Features of Single Side Formwork

  • Adapt to different fresh concrete pressure by different spacing of frames

  • Standard frame brackets can be assembled simply and efficiently with crane assistance

  • Easy to transport both on or out of project site


Specifications of Single Side Formwork

  • Up to 8 meters concrete casting height with single cast

  • Can be moved by manpower by its cast wheels

  • Reserved access ladder and bracket with handrail for operation platform

  • Compatible with G.I. pipe as reinforcement between frames

  • Fully compatible with TECON Base 20 wall formwork, Alumi Frame formwork and HETO frame formwork etc.

  • Can cast different wall heights with below main support frame sizes

      -Height of standard construction frame is 4.0 meters

      -Height of extension frame A is 2.2 meters

      -Height of extension frame B is 1.5 meters

  • Customized supporting frame heights are also available


Application of Single Side Formwork

Single side walls in metro station, sewage treatment plants, and other excavations projects.


Related products of Single Side Formwork

BASE 20 formwork, Dam formwork, Multi-function climbing formwork


Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!