TECON Single Side Wall Formwork

SHARE:

TECON single side formwork or SSF is a standard formwork supporting bracket system, which is specially designed for transferring fresh concrete side pressure to support frame and concrete foundations, and without any tie rod being pulled through the wall.


Features of Single Side Formwork

  • Easy to transport both on or out of the project site.

  • Adapt to different fresh concrete pressure by the different spacing of frames.

  • Standard frame brackets can be assembled simply and efficiently with crane assistance.


Specifications of Single Side Formwork


  • It can be moved by workforce by its cast wheels.

  • Customized supporting frame heights are also available.

  • Up to 8 meters concrete casting height with a single cast.

  • Compatible with G.I. pipe as reinforcement between frames.

  • Reserved access ladder and bracket with handrail for operation platform.

  • Fully compatible with TECON Base 20 wall formwork, Alumni Frame formwork and HETO frame formwork and others.

  • Can cast different wall heights with below main support frame sizes.


Application of Single Side Formwork

Single sidewalls in the metro station, sewage treatment plants, and other excavations projects.


Related products of Single Side Formwork

Dam formwork

BASE 20 formwork

Multi-function climbing formwork


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.