TECON HETO Frame Wall Formwork

SHARE:

TECON HETO formwork is a steel frame panel system lined with 12mm birch film-faced-plywood, universal and high efficient for walls in medium to big scale projects under crane assistance. With the alignment coupler for all panel connections, it ensures very fast site assembly.


Feature of HETO Frame Wall Formwork


1. Large-area shuttering

2. Easy and simple connections

3. Adjustable alignment coupler

4. Adjustable panel

5. Complete piece birch plywood, and replaceable

6. Easy and fast operations



Specifications of HETO Frame Formwork



73mm steel frame depth, Powder coated or hot-dip galvanization finishing, lined with 12mm TECON-Form plywood

Panel widths up to 1.0m, and panel heights up to 3m, with main panel sizes as below table(W*H, mm)


Type

Dimension(mm)(W*L)

Material

Panel 300/100

3000x1000

Q345

Panel 300/75

3000x750

Q345

Panel 300/60

3000x600

Q345

Panel 300/35

3000x350

Q345

Panel 240/100

2400x1000

Q345

Panel 180/100

1800x1000

Q345

Panel 120/100

1200x1000

Q345


Aligned and tight connections by Alignment Coupler, including filler timber compensations up to 10 cm

Allowable fresh concrete pressure: 60 kN/m²



Application of HETO Frame Formwork

Residential & commercial buildings with big area walls, infrastructure projects, adjustable columns etc.



Related products of HETO Frame Formwork

BASE 20 formwork, Steel Lite formwork, Aluflex formwork



Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.