TECON HETO Frame Wall Formwork

SHARE:

TECON HETO formwork is a steel frame panel system lined with 12mm birch film-faced-plywood, universal and high efficient for walls in medium to big scale projects under crane assistance. The alignment coupler for all panel connections ensures high-speed site assembly.

Feature of HETO Frame Wall Formwork

  • Easy to connect.

  • Adjustable panel.

  • Large-area shuttering.

  • Easy and fast operations.

  • Adjustable alignment coupler.

  • Complete piece birch plywood and replaceable.



Specifications of HETO Frame Wall Formwork

"73mm steel frame depth, Powder coated or hot-dip galvanization finishing, lined with 12mm TECON-Form plywood. Panel widths up to 1.0m, and panel heights up to 3m, with main panel sizes as below table (W*H, mm)."

Type

Dimension(mm)(W*L)

Material

Panel 300/100

3000x1000

Q345

Panel 300/75

3000x750

Q345

Panel 300/60

3000x600

Q345

Panel 300/35

3000x350

Q345

Panel 240/100

2400x1000

Q345

Panel 180/100

1800x1000

Q345

Panel 120/100

1200x1000

Q345

Aligned and tight connections by Alignment Coupler, including filler timber compensations up to 10 cm. Allowable fresh concrete pressure: 60 kN/m².



Application of HETO Frame Formwork

Residential & commercial buildings with big area walls, infrastructure projects, adjustable columns and others.


Related products of HETO Frame Formwork

Aluflex formwork

BASE 20 formwork

Steel Lite formwork


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.