TECON HETO formwork is a steel frame panel system lined with 12mm birch film-faced-plywood, universal and high efficient for walls in medium to big scale projects under crane assistance. With the alignment coupler for all panel connections, it ensures very fast site assembly.
1. Large-area shuttering
2. Easy and simple connections
3. Adjustable alignment coupler
4. Adjustable panel
5. Complete piece birch plywood, and replaceable
6. Easy and fast operations
73mm steel frame depth, Powder coated or hot-dip galvanization finishing, lined with 12mm TECON-Form plywood
Panel widths up to 1.0m, and panel heights up to 3m, with main panel sizes as below table(W*H, mm)
Type | Dimension(mm)(W*L) | Material |
Panel 300/100 | 3000x1000 | Q345 |
Panel 300/75 | 3000x750 | Q345 |
Panel 300/60 | 3000x600 | Q345 |
Panel 300/35 | 3000x350 | Q345 |
Panel 240/100 | 2400x1000 | Q345 |
Panel 180/100 | 1800x1000 | Q345 |
Panel 120/100 | 1200x1000 | Q345 |
Aligned and tight connections by Alignment Coupler, including filler timber compensations up to 10 cm
Allowable fresh concrete pressure: 60 kN/m²
Residential & commercial buildings with big area walls, infrastructure projects, adjustable columns etc.
BASE 20 formwork, Steel Lite formwork, Aluflex formwork
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.