TECON Base 20 is a versatile timber beam wall formwork system designed for walls of all sizes and shapes. Built with H20 timber beams, TECON-Form plywood, and steel walings, its independent components allow flexible assembly—ideal for both standard walls and complex structures like curved surfaces. The modular design ensures quick assembly, reusability, and
enhanced cost-efficiency.
Flexible Height & Shape Capabilities-Supports over 9 m height with adjustable widths. Adapts easily to angles and curves for precise shaping.
Boosted Efficiency, Reduced Costs-Large panels allow crane installation and 12 m pours. Fewer ties and joints save time and labor.
Engineered Load Performance-Handles up to 90 kN pressure with optimized spacing. Strong and adaptable for varied loads.
Seamless Integration for High-Rise Projects-Works smoothly with TECON Climbing System for efficient vertical construction.
Dynamic Structural Performance-Fits complex shapes with strong load capacity and quick setup—ideal for custom builds and fast-paced projects.
Premium Finishes & Cost Optimization-Achieves smooth concrete surfaces with minimal joints—reducing rework and saving on finishing costs.
System Type | Timber Formwork |
Material | EN 13377 timber beam |
Max Unit Size | 5*6 m |
Formwork weight | 65 kg/m2 |
Formwork Thickness | 338/341 mm |
Max One-time Casting Height | 12 m |
Installation Time | 100 m2 /day (6 workers) |
Formlining | 18/21 mm Birch Plywood |
Max Permissible Fresh Concrete Pressure | 90 kN/m2 |
Size and Shape | Customized |
Assembly Method | Pre-assembled on site |
Transportation Method | Tower crane |
Versatile Application | Residential, commercial buildings, tanks Basement, bridge abutment and piers, irregular structure projects |
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.