TECON BASE 20 Wall Formwork

SHARE:

TECON BASE 20 is a universal wall formwork consisted of H20 timber beam, TECON-Form plywood and steel waler etc.. Those independent components can be freely assembled. Therefore, TECON BASE 20 formwork is dedicated to suiting all sizes and shapes of walls.

Features of BASE 20 Formwork

  • Suitable for all size and shape requirements due to flexible arrangements of girders and walers

  • Efficient on-site by pre-assembled big size formwork panels under crane assistance

  • Easily achieve fair-faced concrete finishing by high quality shuttering, few tie rods and joints

  • Feasible in column formwork solution


Specifications of BASE 20 Formwork

Consisted of H20 timber beam, steel waler, TECON-Form Plywood and other accessories

Flexible panel widths determined by the length of steel waler

Flexible panel heights determined by the length of H20 girder and panel strut, up to 8m

Plus regular panel sizes (width*height):

  • 3.0m*3.0/3.6/4.0/6.0mm;

  • 4.0m*3.0/3.6/4.0/6.0m;

  • 5.0m*3.0/3.6/4.0/6.0m;  

  • 6.0m*3.0/3.6/4.0/6.0m;

Customized irregular shapes determined by shaping wood and special shape steel waler

Adapt to various fresh concrete pressure up to 90kN/sqm by flexible arrangement of girder and walers


Application of BASE 20 Formwork

Residential & commercial buildings, concrete tanks, basement, bridge abutment and piers, columns, or irregular concrete structure with shaping wood etc..


Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!