< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON BASE 20 Wall Formwork

SHARE:

TECON Base 20 is a versatile timber beam wall formwork system designed for walls of all sizes and shapes. Built with H20 timber beams, TECON-Form plywood, and steel walings, its independent components allow flexible assembly—ideal for both standard walls and complex structures like curved surfaces. The modular design ensures quick assembly, reusability, and

enhanced cost-efficiency.


Features & Benefits
Specification
Projects
Contact

Base 20 Wall Formwork features & benefits

  • Flexible Height & Shape Capabilities-Supports over 9 m height with adjustable widths. Adapts easily to angles and curves for precise shaping.

  • Boosted Efficiency, Reduced Costs-Large panels allow crane installation and 12 m pours. Fewer ties and joints save time and labor.

  • Engineered Load Performance-Handles up to 90 kN pressure with optimized spacing. Strong and adaptable for varied loads.

  • Seamless Integration for High-Rise Projects-Works smoothly with TECON Climbing System for efficient vertical construction.

  • Dynamic Structural Performance-Fits complex shapes with strong load capacity and quick setup—ideal for custom builds and fast-paced projects.

  • Premium Finishes & Cost Optimization-Achieves smooth concrete surfaces with minimal joints—reducing rework and saving on finishing costs.


Specifications of Base 20 Wall Formwork

System TypeTimber Formwork
MaterialEN 13377 timber beam
Max Unit Size5*6 m
Formwork weight65 kg/m2
Formwork Thickness338/341 mm
Max One-time Casting Height12 m
Installation Time100 m2 /day (6 workers)
Formlining18/21 mm Birch Plywood
Max Permissible Fresh Concrete Pressure90 kN/m2
Size and ShapeCustomized
Assembly MethodPre-assembled on site
Transportation MethodTower crane
Versatile ApplicationResidential, commercial buildings, tanks Basement, bridge abutment and piers, irregular structure projects


TECON Base 20 Formwork 3D Assembly Tutorial

   

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry
Name*
Company*
Job Title
Email*
Phone*
Country*
Inquiry Type
Message/Comments*

Please provide details on the nature of your enquiry.

How did you hear about us?
Make an inquiry!