< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON BASE 20 Wall Formwork

SHARE:

TECON BASE 20 is a universal wall formwork consisted of H20 timber beam, TECON-Form plywood and steel waler and others. Those independent components can be freely assembled. Therefore, TECON BASE 20 formwork is dedicated to suiting all sizes and shapes of walls.

Features of BASE 20 Formwork

  • Feasible in column formwork solution.

  • Efficient on-site by pre-assembled big-size formwork panels under crane assistance.

  • Quickly achieve fair-faced concrete finishing by high-quality shuttering, few tie rods and joints.

  • Suitable for all size and shape requirements due to flexible arrangements of girders and walers.



Specifications of BASE 20 Formwork

1. Flexible panel widths are determined by the length of the steel waler.

2. It consisted of H20 timber beam, steel waler, TECON-Form Plywood and other accessories.

3. Flexible panel heights are determined by the H20 girder and panel strut length, up to 8m. "3.0m*3.0/3.6/4.0/6.0m;

  • 4.0m*3.0/3.6/4.0/6.0m;

  • 5.0m*3.0/3.6/4.0/6.0m;

  • 6.0m*3.0/3.6/4.0/6.0m;"

4. Customized irregular shapes are determined by shaping wood and special shape steel waler.

5. Adapt to various fresh concrete pressure up to 90kN/sqm by the flexible arrangement of girder and walers.



Application of BASE 20 Formwork

Residential & commercial buildings, concrete tanks, basement, bridge abutment and piers, columns, or irregular concrete structures shape wood and others.

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!