< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

H20 Timber Beam

SHARE:

TECON H20 Timber Beam is made from spruce imported from Northern Europe which ensures its high bearing capacity. H20 timber beam is widely used in girder-based formwork systems, such as shear wall formwork, slab formwork, column formwork and others.

Features of H20 Timber Beam

  • Universal application in various project sites as girders

  • Yellow waterproof painting for prolonged service life

  • Plastic cap as protection reduces damage and increases service life

  • Spruce grown in extremely cold regions ensures high bearing capacity of timber beam flange

  • Follows EN13377 standards



Specification of H20 Timber Beam

  • Any length less than 6m or equals to 6 m can be customized

  • The length of timber beam can be extended by beam splice

  • Flange: Imported solid wood spruce from North Europe

  • Glue: WBP glue

  • Web: Poplar core plywood

  • Available length: 1.5/1.9/2.45/2.75/2.9/3.0/3.3/3.6/3.9/4.5/4.9/5.9 m

  • Weight: around 4.9 kg/m

  • Allowed Shear Resistance: 11 kN

  • Allowed Bending Resistance: 5 kN

  • Allowed Bearing Resistance: 22 kN

  • Package units: 105 pieces per pallet

  • Wood moisture: 12% +/- 4% at delivery



Application of H20 Timber Beam

     Work as main beam and secondary beam in shear wall, slab, column formwork and others.

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!