TECON Adjustable HETO Frame Column Formwork

SHARE:

TECON Adjustable HETO Frame Column formwork is a steel frame panel system lined with 12mm film-faced-plywood, universal and high efficient for column in medium to big scale projects under crane assistance. With the alignment coupler for all panel connections, it ensures very fast site assembly.

Feature of TECON Adjustable HETO Frame Column Formwork

  • Easy and simple connection with user friendly adjustable alignment couplers

  • Efficient assembly and operation with only a few panel widths and heights, as well as inset tie points

  • Adjustable column sizes with easy transportation

  • Long service life and easy for cleaning by its nice finishing

  • Compatible with normal GI tube for extra reinforcement at lowest cost


Specification of TECON Adjustable HETO Frame Column Formwork

Powder coated or hot-dip galvanization finishing, lined with 12mm TECON-Form Birch

Panels sizes

Panel Width: 1000mm/750mm/600mm/350mm

Panel Height: 3000mm/2400mm/1800mm/1200mm/600mm

Panel weight: around 40kg/sqm

Permitted fresh concrete pressure: 80KN/sqm

Column size

Up to 850x850mm size column without tie rod

Up to 6m height column without vertical waling


Application of TECON Adjustable HETO Frame Column Formwork

Various sizes columns in Residential & commercial buildings, infrastructure projects etc..


Related Products of TECON Adjustable HETO Frame Column Formwork

TECON Adjustable Plastic Column Formwork, BASE 20 Column formwork, Steel Lite Column formwork,

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!