TECON Alumi Frame Wall Formwork

SHARE:

TECON Alumi Frame formwork is consisted of aluminium alloy frame and built-in 15mm birch plywood. 25kg/sqm is a portable weight for laborer. Plus specially designed alignment couplers and inset tie points, it improves work efficiency and reduces work burden in no-crane project site.


Features of Alumi Frame Formwork

  • Simple and easy handling with light weight panels and their limited sizes

  • Fast and firm connection with adjustable alignment couplers

  • Wide application with its inset tie points and extensive range of accessories in various projects

  • Flexible use both horizontally and vertically with formwork panels


Specifications of Alumi Frame Formwork

112mm depth aluminum frame panels lined with 15mm birch core plywood, automatic welding by robot,

Panel widths up to 1.0m, and panel heights up to 3m, with main panel sizes as below table(W*H, mm)

Type

Dimension(mm)(W*L)

Material

Panel 300/100

3000x1000

6061-T6

Panel 300/75

3000x750

6061-T6

Panel 300/50

3000x500

6061-T6

Panel 300/25

3000x250

6061-T6

Panel 250/100

2500x1000

6061-T6

Panel 125/100

1250x1000

6061-T6

Panel 75/100

750x1000

6061-T6


Easy clean due to high temperature powder coated frame

All connections are aligned and tight by adjustable alignment coupler, including filler timber compensations up to 10 cm

Wedge connector offers easy connection in light bearing application such as foundation etc.

Built-in birch plywood service life is extremely extended and create perfect concrete surface

Allowable fresh concrete pressure: 60 kN/m²


Application of Alumi Frame Formwork

Housing, commercial building, foundation, swimming pool and other civil engineering projects.


Ralated Formwork of Alumi Frame Formwork

HETO steel frame formwork,Plastic formwork TP60, Aluflex formwork

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!