< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

TECON Alumi Frame Wall Formwork

SHARE:

TECON Alumni Frame Wall Formwork is a labor-friendly and lightweight panel formwork system. It consists of 6061-T6 aluminum alloy frame formwork panel, adjustable alignment clamp and panel strut etc.. The portable panel and fast connection alignment clamp always improves site efficiency and reduces work burden in no-crane project site.

Features of Alumi Frame Formwork

  • Simple and easy handling with light weight panels and limited panel sizes where crane is not available

  • Fast and firm connection with the adjustable alignment clamp, the only component for all panel connections

  • Flexible use both horizontally and vertically with formwork panels

  • Wide application with its inset tie points and extensive range of accessories in various projects



Specifications of Alumi Frame Formwork

  • Formwork panel is made from 6061-T6 aluminum alloy frame lined with 15mm TECON-Form birch plywood, the depth is 117mm

  • Panel width is 1000mm, 750mm, 500mm and 250mm; Panel height is 3000mm, 2500mm, 1500mm and 750mm

  • The Alumi panel weights around 27kg/sqm

  • Adjustable alignment clamp offers easy connection, also it matches with filler timber joint up to 100mm for wall gap compensation

  • Max permissible fresh concrete pressure: 60 kN/sqm



Application of Alumi Frame Formwork

Housing, commercial building, foundation, swimming pool and other civil engineering projects.


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!