TECON Slab Table Formwork consists of H20 timber beams, plywood, and heavy duty props, all working together as a cohesive unit. This table formwork system is easy and practical to set up, allowing for quick adjustments and relocations. As a result, it offers a cost-effective and efficient solution for constructing large-area slab structures with minimal beam usage.
Efficient: No need for repeated assembly—tables move as whole units. One team can install up to 200 m² per day.
Minimize Labor Costs: Pre-assembled for your needs, the advanced table formwork system cuts labor by 50% and moves easily with a trolley or crane.
Perfect Adaptability: Fits large floor areas and pairs with TST60 towers to reach up to 20 m in height.
Enhanced Architectural Space Optimization: Fewer beams allow wide, column-free spans—TECON's slab table formwork system is ideal for open layouts in modern buildings.
Improved Construction Site Safety: Pre-assembled units and fewer manual steps reduce risks, ensuring safer high-rise operations.
System Type | Timber Formwork |
Material | H20 Timber Beam (EN 13377) |
Formlining | 18/21 mm poplar, hardwood and birch plywood |
Standard Shoring | Class D/E heavy duty prop (EN 1065) |
Max Unit Size | 4*6 m |
Max Permissible Slab Thickness | 1000 m |
Assembly Method | Pre-assembled on site |
Installation Time | 200 m2/day/set (5 workers) |
Transportation Method | Trolley or tower crane |
Versatile Application | Large area floor project, minimal beam structures, high rise buildings, skyscrapers, factory buildings |
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.