< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Slab Table Formwork

SHARE:

TECON Slab Table Formwork consists of H20 timber beams, plywood, and heavy duty props, all working together as a cohesive unit. This table formwork system is easy and practical to set up, allowing for quick adjustments and relocations. As a result, it offers a cost-effective and efficient solution for constructing large-area slab structures with minimal beam usage.


Features & Benefits
Specification
Projects
Contact

Slab Table Formwork Features & Benefits

  • Efficient: No need for repeated assembly—tables move as whole units. One team can install up to 200 m² per day.

  • Minimize Labor Costs: Pre-assembled for your needs, the advanced table formwork system cuts labor by 50% and moves easily with a trolley or crane.

  • Perfect Adaptability: Fits large floor areas and pairs with TST60 towers to reach up to 20 m in height.

  • Enhanced Architectural Space Optimization: Fewer beams allow wide, column-free spans—TECON's slab table formwork system is ideal for open layouts in modern buildings.

  • Improved Construction Site Safety: Pre-assembled units and fewer manual steps reduce risks, ensuring safer high-rise operations.


Specification of Slab Table Formwork System

System TypeTimber Formwork
MaterialH20 Timber Beam (EN 13377)
Formlining18/21 mm poplar, hardwood and birch plywood
Standard ShoringClass D/E heavy duty prop (EN 1065)
Max Unit Size4*6 m
Max Permissible Slab Thickness1000 m
Assembly MethodPre-assembled on site
Installation Time200 m2/day/set (5 workers)
Transportation MethodTrolley or tower crane
Versatile ApplicationLarge area floor project, minimal beam structures, high rise buildings, skyscrapers, factory buildings


TECON Slab Table Formwork 3D Assembly Tutorial

   

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry
Name*
Company*
Job Title
Email*
Phone*
Country*
Inquiry Type
Message/Comments*

Please provide details on the nature of your enquiry.

How did you hear about us?
Make an inquiry!