+86-(0)512-65650586
info@teconform.com
English
Suzhou TECON Construction Technology Co., Ltd

Slab Table Formwork

SHARE:

TECON Slab table formwork is one of the most efficient slab shuttering solution, especially for large area and multiple floors structure. Slab table can be quickly moved into the next floor by single crane lift due to pre-assembled tables combine with H20 timber beam, plywood and heavy duty prop etc.

Features of Slab Table Formwork

1. Big shuttering area tables increase site efficiency greatly

2. Ready-to-use table units avoid repeated assembly and dismantle from every floor

3. Easy and fast to next position via trolley or tower crane

4. Fully compatible with other timber beam formwork with its H20 timber beam, plywood and steel props


Specification of Slab Table Formwork

1. Pre-assembled slab tables with customized sizes, and biggest size up to 3*6m

2. Slab thicknesses up to 50 cm; and bigger slab thicknesses or dimensions with additional support

3. Clearance storey height up to 5.5 m

4. Horizontal transportation by transporting trolley and vertical transportation from different floors by crane with lifting fork.

5. Can be used with TECON Shoring Tower ST60 for much bigger height up to 20m


Application of Slab Table Formwork

Residential & commercial buildings, and factories with large area and multiple floors etc..


Related products of Slab Table Formwork

BASE 20 wall formwork, Slab flex 20 formwork,  Aluflex formwork

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Search Now or Make an inquiry!
Search Now or Make an inquiry!