TECON Slab Flex 20 formwork is the most flexible slab formwork. It's highly optimum for multiple beams. Slab Flex 20 is mainly consisted of H20 timber beam, shoring props and TECON-Form plywood. Their position and spacing can be freely connected. Thus it provides maximum flexibility and ideal solution for most of complicated plans, slabs with drop beams or forming operation in narrow spaces.
Flexible and ideal for all ground plans
Long service life with systematic components
Efficient assembly by manual
For all finishing requirements by different quality of shutterings
Easy transportation and storage
For any slab plan and slab height
For different slab thickness up to 100cm
Consisted of main beam & secondary H20 timber beam , and TECON-Form Plywood at 18mm or 21mm
TEP-B series prop and heavy duty prop TEP-D,TEP-E with high work load-bearing capacity for your choice
Beam 20 Bracket and Beam 20 Extension with easy tighten system by D15 rod & nut
No infill areas due to specific tailored planning
Residential & commercial buildings, slab & flyover road etc.
Slab Table formwork/Alu Flex formwork/BASE 20 Wall formwork
You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other system, the lead time is from 30 to 45 days.
For more accurate lead time, please contact us for specific product based on your quantity.