< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Slab Flex 20 Formwork

SHARE:

TECON Slab Flex 20 Formwork consists of H20 timber beams, shoring props, and TECON-Form plywood. Its adjustable positioning and spacing make it suitable for complex floor plans, slabs with drop beams, or projects with narrow spacing. This system offers a flexible and ideal solution.


Features & Benefits
Specification
Projects
Contact

Slab Flex 20 Formwork features & benefits

  • Flexible-Fits any slab thickness, height, layout, or design—including projects with dense drop beams.

  • Selective-Offers multiple choices in plywood, props, and beams to match different project needs.

  • Cost-saving-Timber beams enable fast, prefabricated construction and offer lower long-term costs than steel.

  • Easy to Store-Durable coatings ensure components are storage-friendly and ready for any environment.

  • Long service life -With various plywood options such as poplar, hardwood, and birch, the usage ranges up to 50 times, and they are replaceable.


Specifications of Slab Flex 20 Formwork

System TypeTimber Formwork
MaterialTimber beam ( EN 13377)
Formlining18/21 mm poplar, hardwood, and birch plywood
Standard ShoringClass D or E heavy duty prop (EN 1065)
Max Permissible Slab Thickness1000 mm
Early Dismantle SystemAvailable
Size and ShapeCustomized
Installation Time80 m2/day/person
Assembly MethodManually assemble for every floor
Transportation MethodManpower or tower crane
Versatile ApplicationSlab and beams in all types of buildings, fly-over roads, bridges, tanks, parking lots, factory buildings

TECON Flex 20 Slab Formwork Video

   

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry
Name*
Company*
Job Title
Email*
Phone*
Country*
Inquiry Type
Message/Comments*

Please provide details on the nature of your enquiry.

How did you hear about us?
Make an inquiry!