< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Slab Flex 20 Formwork

SHARE:

TECON Slab Flex 20 formwork is the most flexible slab formwork. It's highly optimized for multiple beams. Slab Flex 20 is mainly consisted of H20 timber beam, shoring props and TECON-Form plywood. Their position and spacing can be freely connected. Thus flex system formwork provides maximum flexibility and an ideal solution for most complicated plans, slabs with drop beams or forming operations in narrow spaces.

Features of Slab Flex 20 Formwork

  • Efficient assembly by manual.

  • Easy transportation and storage.

  • Flexible and ideal for all ground plans.

  • Long service life with systematic components.

  • For all finishing requirements by the different quality of shutters.

Specification of Slab Flex 20 Formwork

  • For any slab plan and slab height.

  • For different slab thicknesses up to 100cm.

  • No infill areas due to specifically tailored planning.

  • Beam 20 Bracket and Beam 20 Extension with easy tighten system by D15 rod & nut.

  • The main beam & secondary H20 timber beam, and TECON-Form Plywood at 18mm or 21mm.

  • TEP-B series prop and heavy-duty prop TEP-D, TEP-E with high workload-bearing capacity for your choice.


Application of Slab Flex 20 Formwork

Residential & commercial buildings, slab & flyover road and others.

Related formwork of Slab Flex 20 Formwork

Alu Flex formwork

Slab Table formwork

BASE 20 Wall formwork


Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry!
Make an inquiry!