Quality Management System of Aluminium Formwork Manufacturers

What is the quality management system of aluminum alloy formwork manufacturers? Next, the engineering staff of aluminium formwork manufacturers will specifically talk about the quality management of aluminium formwork.


1. Aluminum alloy formwork manufacturers adhere to the license system


Relevant personnel in special positions (measurement, testing, etc.) must be trained to obtain a qualification certificate and a job certificate before they can take up the job.


2. Aluminium formwork manufacturers adhere to the "three inspection system"


The project quality objectives have been established and implemented during the construction process. Adhere to the implementation of the "self-inspection, special inspection, handover inspection" system, and never leave problems and hidden dangers to the next process. The construction quality of various types of work, procedures, and sub-projects, as well as the entry of materials, construction tests, changes to drawings, processing orders, construction plans and technical measures are strictly implemented in this system, so as to find problems as soon as possible and solve them in time.


3. Aluminum alloy formwork manufacturers adhere to the technology first system


Before the aluminium formwork factory project starts, the technical department should make a disclosure to the construction management personnel, team leaders, etc. on the key issues of the technical quality points of the entire project.


Before the construction of the sub-project aluminium formwork, the foreman is responsible for the technical quality disclosure work to the team leader and the team leader to the team members. The disclosure work shall be mainly in written form, and construction shall not be carried out without disclosure.


For key processes and key parts, the foreman shall be responsible for on-site determination and verification, and the technical department of aluminum alloy formwork manufacturers shall review and supervise each key link and important process, and solve problems in a timely manner.


4. Aluminium formwork manufacturers adhere to the quality regular meeting system


In regular or irregular production meetings, while arranging production plans, adhere to quality work arrangements. Special quality meetings are held regularly, and production managers and full-time quality inspectors at the construction site present quality dynamic reports, and study and formulate quality work plans and countermeasures.


As one of the leading experts in formwork and scaffolding engineering, our wide range of off-the-shelf and custom products ensures that we can provide a solution for your construction project, no matter the size or location.


With the expertise of our R&D team, our technical team members are on-site to assist you when necessary, and knowing that our solutions are always cost-effective, you can rest assured that we have support from first contact to completion of construction you. Welcome to consult.

  • Slab Table Formwork
    Slab Table Formwork
    TECON Slab table formwork is one of the most efficient slab shuttering solution, especiall...
  • TECON Alu Flex Formwork
    TECON Alu Flex Formwork
    TECON Aluflex formwork is a very high efficient and light weight slab formwork which saves...
  • Acrow Prop
    Acrow Prop
    TECON Acrow Props, as one main prop serie among all TECON shoring props, is available in 5...