Self-climbing Formwork TSC50 & TSC100

SHARE:

TECON Self-climbing formwork TSC50 & TSC100 is a crane independent climbing system. It offers efficient and cost saving concreting solution for high-rise building, bridge pylons etc.. Up to 100kN lifting capacity and reliable embedded anchorage system ensures stable and safe automatic climbing with integrated formwork together.

Feature of Self-climbing Formwork TSC50 & TSC100

  • Efficient automatic climbing and easy operation, thus without occupying tower crane schedule

  • Reliable climbing bracket and the embedded anchorage system proven by lots project sites

  • Safe and fully sealed operation platform regardless weather influence

  • Can be shifted from one project to another despite of different geometry

  • Multi-Platforms design allow workers operating on different level


Specification of Self-climbing Formwork TSC50 & TSC100

  • Rail-guided, safe & stable climbing procedure without crane assistance

  • Hydraulic cylinder (climbing device) with 50kN and 100kN lifting capacity

  • 0.5 hour per floor climbing speed

  • Maximum 6m casting height

  • Around 7-10 days per level cycle including tie rebar

  • Available climbing incline at ±15°slope

  • Width of platform:

                                     Main platform: 2.4m/ 2.7m

                                     Top platform: 0.75m/1.2m

                                     Bottom platform: 1.2m


Application of Self-climbing Formwork TSC50 & TSC100

Shaft core structures of high-rise building, bridge pylons etc.


Related Products of Self-climbing Formwork TSC50 & TSC100

Climbing formwork CB240, Dam formwork, Protection screen

Latest News
FAQ
  • Q
    1. How to get a quotation?

    You can send us your material list to request for a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.


  • Q
    2. What is the payment term?

    By T/T or L/C.


  • Q
    3. What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.

    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.

    For other system, the lead time is from 30 to 45 days.

    For more accurate lead time, please contact us for specific product based on your quantity.

Make an inquiry!
Make an inquiry!