Self-climbing Formwork TSC50 & TSC100

SHARE:

TECON Self-climbing formwork TSC50 & TSC100 is a crane independent climbing system. It offers efficient and cost saving concreting solution for high-rise building, bridge pylons etc.. Up to 100kN lifting capacity and reliable embedded anchorage system ensures stable and safe automatic climbing with integrated formwork together.

Feature of Self-climbing Formwork TSC50 & TSC100

  • Efficient automatic climbing and easy operation, thus without occupying tower crane schedule

  • Reliable climbing bracket and the embedded anchorage system proven by lots project sites

  • Safe and fully sealed operation platform regardless weather influence

  • Can be shifted from one project to another despite of different geometry

  • Multi-Platforms design allow workers operating on different level


Specification of Self-climbing Formwork TSC50 & TSC100

  • Rail-guided, safe & stable climbing procedure without crane assistance

  • Hydraulic cylinder (climbing device) with 50kN and 100kN lifting capacity

  • 0.5 hour per floor climbing speed

  • Maximum 6m casting height

  • Around 7-10 days per level cycle including tie rebar

  • Available climbing incline at ±15°slope

  • Width of platform:

                                     Main platform: 2.4m/ 2.7m

                                     Top platform: 0.75m/1.2m

                                     Bottom platform: 1.2m


Application of Self-climbing Formwork TSC50 & TSC100

Shaft core structures of high-rise building, bridge pylons etc.


Related Products of Self-climbing Formwork TSC50 & TSC100

Climbing formwork CB240, Dam formwork, Protection screen

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.