TECON Self-climbing formwork TSC50 & TSC100 is a crane independent climbing system lifted by hydraulic cylinders. It offers efficient and cost saving concreting solution for high-rise building, bridge pylons etc.. Up to 100kN lifting capacity and reliable embedded anchorage system ensures stable and safe automatic climbing with integrated formwork together.
Efficient automatic climbing and easy operation, thus without occupying tower crane schedule
Reliable climbing bracket and the embedded anchorage system proven by lots project sites
Safe and fully sealed operation platform regardless weather influence
Can be shifted from one project to another despite of different geometry
Multi-Platforms design allow workers operating on different level
Rail-guided, safe & stable climbing procedure without crane assistance
Main platform width: 2.4/2.7 m
Top platform width: 0.75/1.2 m
Bottom platform width: 1.2 m
Maximum casting height: 6 m 0.5 hour per floor effective climbing speed
Available climbing incline at ±15°slope
Per level cycle including tie rebar: around 7-10 day s
Standard bracket height: 11/13 m
Standard bracket distance: 4 m
The platform number: 4/5 floors
Hydraulic cylinder lifting capacity: 50/100 kN
Core wall of high-rise building, bridge pylon, tank, etc..
You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.
Email: info@teconform.com
Phone: +86-512-65650586
Mobile: +86-13862020161.
By T/T or L/C.
For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.
For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.
For other systems, the lead time is from 30 to 45 days.
For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.