TECON Alu-Flex Formwork

SHARE:

TECON Alu-Flex formwork is a very highly efficient and lightweight slab formwork that saves labor greatly without crane assistance. Due to the very few components design, easy assembly sequence, and light-weight aluminum panel, two workers are enough for formwork erection, with much higher output.

Features & Benefits
Specification
Projects
Contact

Features of Alu-Flex Slab Formwork

  •  Large-area shuttering

  •  Easy and fast operations

  •  Early stripping heads (drop heads) help to maximize the usage of aluminum panels, with themselves left on the lower floor together with floor props

  •  Applicable to other formwork

  •  Improved safety measurements via support and protection at the structure's edge

  • Complete birch plywood, and replaceable


Specification of Alu-Flex Slab Formwork

  • Biggest panel size 1.8*1.8m, weights 57.61kg and covers 3.24 m2, it can bear slab thickness up to 200mm with 4 pcs props, and bear slab thickness up to 700mm with 5 pcs props.

  • Smallest panel size 0.9*0.6m, weights 15.29kg and covers 0.54 m2, it can bear slab thickness up to 700mm with 4 pcs props.

  • Two workers are enough for the erection, stripping, and removal of Alu-Flex formwork without a tower crane. Panels weigh around 20kg/m2. There are 12 kinds of panel sizes to meet different structures.



  • image.png

Application of Alu-Flex Slab Formwork

Frame structure, such as slab-column structure, few-beam structure, Large-area slab standard, and slab construction.


TECON Alu-Flex Formwork 3D Tutorial

 

Latest News
FAQ
  • Q
    How to get a quotation?

    You can send us your material list to request a quotation, or you can also simply send us the structural drawing and project information for complete formwork & scaffolding proposal via the below contacts.


    Email: info@teconform.com

    Phone: +86-512-65650586

    Mobile: +86-13862020161.

  • Q
    What is the payment term?

    By T/T or L/C.

  • Q
    What is the lead time?

    For climbing formwork, self-climbing platform, plastic formwork, we have stock in our warehouse. The preparation of loading will be within 10 to 15 days.


    For H20 timber beam, TECON-Form Shuttering, the lead time is from 15 to 25 days.


    For other systems, the lead time is from 30 to 45 days.


    For a more accurate lead time, don't hesitate to contact us for a specific product based on your quantity.

Make an inquiry
Name*
Company*
Job Title
Email*
Phone*
Country*
Inquiry Type
Message/Comments*

Please provide details on the nature of your enquiry.

How did you hear about us?
Make an inquiry!