< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=515983293226143&ev=PageView&noscript=1" />
Suzhou TECON Construction Technology Co., Ltd
Suzhou TECON Construction Technology Co., Ltd

Training Session of SCP (Self-Climbing Platform) in Beijing

TECON engineers were invited to attend the Training Session of Climbing Platform on 22nd of July, in Beijing, organized by industry association and one famous domestic SCP brand, total 6 days. Scores of Climbing Platform experts from different cities took part in this training. The purpose was to share and study the development of Climbing Platform Industry.


First generation called Attached Climbing Platform, and it was developed in late 1990s. The flame retardant standard is difficult to meet the relevant requirements of government, due to the using of safety net. Meanwhile, its ability to prevent puncture is too weak. During construction, steel bar, formwork or wall rods can go through net, which is easy to cause object strike accidents.


After years of development, the latest generation, called Integrated Self-Climbing Platform, also called SCP(Self-climbing Platform) in South East Asia Region, has come into site application with greatly improved safety and efficiency.

All the components are prefabricated in factory, which integrates the protective functions of external protective net, foot plate, horizontal and vertical bar, scissors brace, kick board, flip board and so on. It is attached to the building structure and can rely on its own power lifting equipment, mainly electrical hoist and chain black, to carry out the construction external protection products, which has anti-overturning, anti-falling device and lifting intelligent control system with overload alarm. It is a new technology which replaces the traditional scaffolding technology of high-rise building construction.


TECON SCP are more advanced than any of domestic systems due to export oriented standard, as well as brand building strategy, we not only supply SCP planning and high quality fabrication, but also supply PE calculation and technical support on site.


Meanwhile, TECON Protection Screen, a European design system lifted by hydraulic cylinder, similar with Doka SKE, offers you another option for difference preference. It is more economic and stable system compared with SCP.


Contact us for pricing and more details right now.

Training Session of SCP (Self-Climbing Platform) in Beijing

  • Slab Flex 20 Formwork
    Slab Flex 20 Formwork
    TECON Slab Flex 20 formwork is the most flexible slab formwork. It's highly optimum for mu...
  • Light Duty Prop
    Light Duty Prop
    TEP-B props are widely used where there asks for economic solution and no special requirem...
  • Shoring Tower TST60
    Shoring Tower TST60
    TECON Shoring Tower TST60 is the fast assembly and cost-effective supporting frame system ...
  • VietBuild HCMC 2023

    VietBuild HCMC 2023

    From June 14 to June 18, TECON participated in VietBuild 2023. Although the exhibition was not the most visited during this period, we still decided to participate. The reason is that we are expanding...
  • Successful Conclusion of BTSE 2023

    Successful Conclusion of BTSE 2023

    From June 3-5, TECON participated in the 13th China International Formwork Scaffolding Construction Technology and Product Equipment Exhibition. We are well prepared with three of our main formwork sy...
  • TECON 2023-2024 Exhibition Plan

    TECON 2023-2024 Exhibition Plan

    With the gradual recovery of the world economy, many large-scale activities are in full swing, which, of course, can not do without the exhibition of different countries. Thus, TECON has also decided ...